Download Print this page

Furuno Doppler Speedlog DS-50 Installation Manual page 32

Hide thumbs Also See for Doppler Speedlog DS-50:

Advertisement

5.2 Cable Fabrication
5.2
Cable Fabrication
1. Transducer cable
2. Cable between transceiver unit, junction box and processor unit
(TTYCY-19S)
1) Transceiver unit/ junction box
Anticorrosive sheath
Rubber gasket
2) Processor unit
Cores and shields are fabricated the same as on transceiver unit/junction box side.
To ground the cable, remove paint from the armor and set the armor in the cable
clamp.
25
Shorten considering location on terminal strip
Rubber gasket
Gland
Taping
Figure 5-1 Fabrication of transducer cable
Figure 5-2 Cable fabrication
Figure 5-3 Cable fabrication
FV1.25-4
FV1.25-4
Insulating tubing
FV1.25-4
Taping
To #16 terminal on terminal strip
Note: 1. Unravel shield only
near terminal strip.
2. Fold back armor onto
FV1.25-4
washer and insert
between washer and
gland.
Armor
Washer

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Doppler speedlog ds-510