TFP1466
Page 8 of 20

Installation

The TYCO DV-5
Valve is to be installed
a
in accordance with this section.
NOTICE
DV-5A Automatic Water Control Valves
are designed to be used in freshwater
systems. When the supply is from an
alternative source such as brackish
water, saltwater, or contains additives
such as foam, the limited warranty is
reduced to one year from the time of
installation. An increase in frequency of
inspections is required when the valve
is exposed to such supplies and other
corrosive conditions or chemicals that
could impact valve materials or the
operation of the assembly. The system
and all components must be designed
accordingly for the increased demand.
It is required to thoroughly flush the
valve and trim assembly with freshwa-
ter and reset to the set condition after
each operation.
Proper operation of the DV-5
depends upon their trim being installed
in accordance with the instructions
given in this technical data sheet.
Failure to follow the appropriate trim
diagram may prevent the DV-5
from functioning properly, as well as
void approvals and the manufacturer's
warranties.
The DV-5
Valve must be installed in a
a
readily visible and accessible location.
The DV-5
Valve and associated trim
a
must be maintained at a minimum tem-
perature of 40°F (4°C).
Heat tracing of the DV-5
a
associated trim is not permitted. Heat
tracing can result in the formation of
hardened mineral deposits that are
capable of preventing proper operation.
Always open the system control valves
slowly to avoid a sudden rush of water
entering the system.
The DV-5
Valve is to be installed in
a
accordance with the following criteria:
Step 1. All nipples, fittings, and devices
must be clean and free of scale and
burrs before installation. Use pipe
thread sealant sparingly on male pipe
threads only.
Step 2. The DV-5
trimmed in accordance with one of the
trim illustrations shown in Figure 5.
Note: If the addition of an Alarm Control
Valve is desired or required by the local
AHJ, the Alarm Control Valve noted as
Item H in Figure 8 is to be a separately
ordered electronically supervised normally
open valve.
Step 3. Care must be taken to ensure
that check valves, strainers, globe
valves, etc., are installed with the flow
arrows in the proper direction.
Step 4. Drain tubing to the Drip Funnel
must be installed with smooth bends
that will not restrict flow.
Step 5. The Main Drain and Drip Funnel
Drain may be interconnected provided
a check valve is located at least 12 in.
(300 mm) below the Drip Funnel.
Step 6. Suitable provision must be
Valves
a
made for disposal of drain water. Drain-
age water must be directed such that
it will not cause accidental damage to
property or danger to persons.
Valve
Step 7. Connect the Diaphragm Supply
a
Valve to the inlet side of the System
Main Control Valve in order to facilitate
setting of the DV-5
8).
Step 8. An Inspector's Test Connection
is to be located on the sprinkler system
at the most hydraulically demanding
location.
Step 9. A suitable automatic air (nitro-
Valve or its
gen) supply, as described in the appli-
cable Electric/Electric Actuation
sub-section, is to be installed in accor-
dance with the applicable technical
data sheet. The minimum air pressure
is to be in accordance with the refer-
enced sub-sections.
Step 10. A desiccant dryer, when spec-
ified, is to be installed between a drip
leg and the Air Maintenance Device.
Step 11. The Low Pressure Switch on
Valve must be
a
falling pressure in the Electric/Electric
Actuation is to be adjusted so that the
low pressure alarm setting is set at
3 psi (0,21 bar) below the system air
pressure.
Step 12. Unused Pressure Alarm
Switch connections must be plugged.
Step 13. The Pressure Relief Valve on
rising pressure is to be at 5 psi (0,34 bar)
higher than the required system air
pressure, or be reset in accordance
with the requirements of the authority
having jurisdiction.
To reset the Pressure Relief Valve, first
loosen the jam nut and then adjust the
cap accordingly, clockwise for a higher
pressure setting or counter clockwise
for a lower pressure setting. After ver-
ifying the desired pressure setting,
tighten the jam nut.
Step 14. Conduit and electrical con-
nections are to be made in accordance
with the applicable standards of the
approval agency.
Step 15. Before a system hydrostatic
test is performed, the DV-5
Chamber is to be depressurized, the
Automatic Drain Valve is to be tem-
Valve (see Figure
a
porarily replaced with a plug, and the
Diaphragm Cover Bolts must be uni-
formly and securely tightened using
a cross-draw sequence. After tight-
ening, double-check to make certain
that all of the Diaphragm Cover Bolts
are securely tightened. See Table B in
the Care and Maintenance section for
torque specifications.
Diaphragm
a

Hide quick links: