Power Connection; Accessibility Of Power Supply - Otto SY-103D3-E3-C9-600 Instruction Manual

Glass chimney hood (white/black)
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 25
Information for installation
To avoid disturbing, visible cables later, the power connection should also be

Power connection

planned before installation.
Work on the electrical installations must only be carried out by
Danger!
qualified personnel. If an additional socket is required for the
appliance, commission a specialist electrical firm.
The statutory regulations must be complied with so that the plug is also

Accessibility of power supply

accessible. This means that it must still be possible to reach the plug even once
the two chimney sections have been installed. However, if after installation the
plug is not accessible, a switch must be installed, in accordance with the standards
DIN EN 60335-1 and IEC 61058-1, that ensures an all pole disconnection of the
appliance.
The installation and electrical installation should only be performed by an
authorised specialist.
We cannot accept any liability in cases of improper use or incorrect handling.
The extraction hood complies with the European Directives Nos. 76/889 EEC and
82/499 EEC on radio interference.
Information
9
English

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sy-103d3-e3-c9-900306073491146635309777491

Table of Contents