Commissioning Log Sheet - Trane RAUP 250 Installation Operation & Maintenance

Split system condensing units 20-55 tons
Hide thumbs Also See for RAUP 250:
Table of Contents

Advertisement

START-UP ENGINEER/TECHNICIAN NAME:
PROJECT NAME
DEALER/CONTRACTOR
SALES OFFICE LOCATION
DATE COMMISSIONED
1.Nameplate information
Model No.
Voltage
2. Compressor (S)
A. Voltage at Compressor Terminals
Comp. No. 1:
Comp. No. 2:
Comp. No. 3:
Comp. No. 4:
Voltage Imbalance :
B. Amp Draw
Comp. No. 1:
Comp. No. 2:
Comp. No. 3:
Comp. No. 4:
3. Operating Conditions
A. Circuit "A"
Discharge Pressure.
Liquid Line Pressure.
Liquid Line Temp.
Subcooling.
Amblent Temp.
B. Circuit "B"
Discharge Pressure.
Liquid Line Pressure.
Liquid Line Temp.
Subcooling.
Amblent Temp.
4. Controls
A. All Fans Operating
Properly?
5. Refrigerant Piping
Evacuation Level

Commissioning Log Sheet

:
:
:
:
Serial No.
RLA
T1
T1
T1
T1
Comp. "1"
Comp. "2"
Comp. "3"
Comp. "4"
T1
T1
T1
T1
Suction Pressure
Suction Line Temp.
SuperHeat
Evap. Entering Air Temp. (DB/WB)
Evap. Discharge Air Temp. (DB/WB)
Suction Pressure
Suction Line Temp.
SuperHeat
Evap. Entering Air Temp. (DB/WB)
Evap. Discharge Air Temp. (DB/WB)
[ ] Yes
[ ] No
Fan Inoperative
System Charge
T2
T3
T2
T3
T2
T3
T2
T3
T2
T3
T2
T3
T2
T3
T2
T3
31