10
TPS1.1L LA
Step 6. Remove frame-PCB.
Remove 7 screws as Fig.8.
Step 7. Remove Metal frame.
Remove 16 screws as Fig.9.
Step 8. Remove Metal frame.
Remove 4 screws as Fig.10.
4. Mechanical Instructions
Fig.8
4.2 Set Re-assembly
To re-assemble the whole set, execute all processes in reverse
order.
Notes:
a. While re-assembling, make sure that all cables are placed
and connected in their original position.
b. Pay special attention not to damage the EMC foams at the
SSB shielding. Check that EMC foams are put correctly on
Fig.9
Fig.9
their places.
In warranty, it is not allowed to disassembly the LCD panel, even the
backlight unit defect.
Out of warranty, the replacment of backlight unit is a correct way
when the defect is cused by backlight (CCFL,Lamp).
Fig.10
Fig.11
Service Position
Fig.12