Lift-up drain piping
If it is necessary to increase the height of the drain hose somewhat, install a lift-up drain piping.
1. Connect a lift-up drain pipe top to the drain hose with an adhesive for PVC.
2. Wrap the insulation drain with a vinyl tape.
3. Connect the lift-up drain pipe to the indoor unit drain hose with an adhesive for PVC.
4. Turn the lift-up drain piping, then adjust the height.
If it is raised higher than 550mm(21.65"), there can be water leaks.
NOTE
If a concentrated drain hose is installed, refer to the figure below.
NOTE
Testing the drainage
You should test drainage after completing the installation.
Prepare a little water about 1.0 liter(1.0 quart).
1. Open the cover water supply intake.
2. Pour water into the water supply intake.
3. Operate the unit in the Cool mode and check a drain pump pumping.
4. Check drain water drops at the end of the drainpipe.
5. Make sure there is no water leak at the drainage.
6. When you finished the test, close the coverside.
When maintaining the air conditioner, remove condensate water
remained in the drain pan by using a drain port for maintenance.
CAUTION
FJM IDU-PH_Cassette type_IM_31595A-04_EN.indd 17
Air ventilation
Drainpipe
Drain water drops
Drain clamp
Concentrated drain hose
MH✴✴✴FSBA
Air outlet
Leveler
MH✴✴✴FMBA
Cover drain pump
Fresh air intake
❈ New refreshed air is flowing from outside
towards indoor unit through the hole.