Power Up Sequence - Dell Neworking S6000-ON Installation Manual

Open networking
Hide thumbs Also See for Neworking S6000-ON:
Table of Contents

Advertisement

the input circuits are correctly sized for the loads and that you use sufficient overcurrent protection devices.
all protective covers are in place.
blank panels are installed if you do not install optional modules.
NOTE:
A US AC power cable is included for powering up an AC power supply. You must order all other power cables separately.
NOTE:
ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap when
handling the S6000–ON system and its components.

Power up sequence

When the system powers up, the fans immediately come on at high speed. The fan speed slows as the system continues to boot up.
S6000–ON installation
23

Advertisement

Table of Contents
loading

Table of Contents