Preparation of Piping

Main cause of gas leakage is defect in flaring work. Carry out correct flaring work in the fol-
lowing procedure.
1. Cut the pipes and the cable.
n Use the accessory piping kit or the pipes pur-
chased locally.
n Measure the distance between the indoor
and the outdoor unit.
n Cut the pipes a little longer than measured
distance.
n Cut the cable 1.5m longer than the pipe
length.
2. Burrs removal
n Completely remove all burrs from the cut
cross section of pipe/tube.
n Put the end of the copper tube/pipe to down-
ward direction as you remove burrs in order
to avoid to let burrs drop in the tubing.
3. Flaring work
n Carry out flaring work using flaring tool as
shown below.
Pipe
Indoor unit
[kW(Btu/h]
Gas(mm) Liquid(mm) Gas(mm) Liquid(mm)
<5.6(19,100)
12.7
<16.0(54,600)
15.88
<22.4(76,400)
19.05
Firmly hold copper tube in a bar(or die) as indi-
cated dimension in the table above.
4. Check
n Compare the flared work with figure below.
n If flare is noted to be defective, cut off the
flared section and do flaring work again.
" A "
6.35
0.5~0.8
0~0.5
9.52
0.8~1.0
0.5~0.8
9.52
1.0~1.3
0.5~0.8
Copper
Slanted Uneven Rough
tube
90°
Pipe
Point down
Bar
Bar
"A"
Copper pipe
Clamp handle
Smooth all round
Inside is shining without scratches.
= Improper flaring =
Inclined
Surface
damaged
Even length
all round
Installation Manual 9
Installation
Reamer
Handle
Yoke
Cone
Red arrow mark
Cracked Uneven
thickness

Advertisement

Table of Contents
loading

This manual is also suitable for:

Multi v pqrcvsl0qw

Table of Contents