Daikin FTKS09JV2S Service Manual page 14

Removal procedure, 2.0/2.2/2.5/2.8/3.5/3.6/4.1/4.2/4.6/ 5.0 kw class, 7000/9000/12000/15000 btu/h class
Table of Contents

Advertisement

PCBs
Step
5. Remove the display PCB.
1
Unfasten the 4 hooks
and remove the display
PCB.
2
Disconnect the
connector [S49].
6. Remove the control PCB.
1
Unfasten the 2 lower
hooks of the control
PCB.
2
Lift up the bottom of the
control PCB and pull it
out.
12
Procedure
Hook
[S49]
Control PCB
Display
PCB
(R21140)
[S49]: control PCB
(R21141)
Hook
(R21142)
(R8098)
Si041252EE
Points
The display PCB faces the
rear side of the signal
receiver unit.
The control PCB is also held
by 2 upper hooks. When
reassembling, be sure to fit
all the 4 hooks.
Removal Procedure

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents