更多资料请访问深度汽车论坛 http://shenduauto.com/ 客服QQ:1398556747 电话:18218750259
–
Apply press sleeve -T40048/4- (installation depth 5 mm)
to crankshaft using M8×55 mm bolts.
–
Screw in bolts -arrows- hand-tight to start with.
–
Tighten bolts alternately,
seal onto stop.
Remaining installation steps are carried out in reverse se-
quence; note the following:
–
Install vibration damper
–
Install poly V-belt
⇒ page
1.6
Removing and installing sealing flange
(front)
Special tools and workshop equipment required
Electric drill with plastic brush attachment
♦
Safety goggles
♦
Sealant ⇒ Parts catalogue
♦
Removing
Caution!
Observe notes on procedure for disconnecting the battery
⇒ Rep. Gr. 27.
–
Disconnect earth wire at battery with ignition switched off.
–
Drain off coolant
⇒ page
–
Remove poly V-belt
–
Remove toothed belt for high-pressure pump
–
Remove coolant pipe (right-side)
–
Mark position of vibration damper for re-installation.
–
Unscrew bolts -1- and remove vibration damper.
6-cylinder TDI engine (3.0 ltr. 4-valve common rail), mechanics 01.2006
1
/
turn at a time, to press in oil
2
⇒ page
40.
39.
161.
⇒ page
39.
⇒ page
177.
⇒ page
48.
1 Servicing work on pulley end
Audi Q7 2007 !
6
43