Weil-McLain CGA Series 2 Manual page 29

Gas-fired water boilers
Hide thumbs Also See for CGA Series 2:
Table of Contents

Advertisement

CGa Series 2 Gas-Fired Water Boiler — Boiler Manual
6a
Start-up — preparation
Fill the system with water
1. Close manual and automatic
Fill to correct system pressure.
2.
application. Typical cold water fill pressure for a residential system is
12 psi.
Purge air
3.
from system:
a. Connect a hose to the purge valve (see drain valves, item
gested piping diagrams on pages 17 through 23,
Figure 16
). Route hose to an area where water can drain and be
seen.
b. Close the boiler or system isolation valve between the purge valve
and fill connection to the system.
c. Close zone isolation valves.
d. Open quick-fill valve on cold water makeup line.
e. Open purge valve.
f. One zone at a time, open the isolation valves. Allow water to run
through the zone, pushing out the air. Run until no noticeable air
flow is present. Close the zone isolation valves and proceed with the
next zone. Follow this procedure until all zones are purged.
g. Close the quick-fill water valve and purge valve and remove the
hose. Open all isolation valves. Watch that system pressure rises to
correct cold-fill pressure.
h. After the system has operated for a while, eliminate any residual air
by using the manual air vents located throughout the system.
i. If purge valves are not installed in system, open manual air vents in
system one at a time, beginning with lowest floor. Close vent when
water squirts out. Repeat with remaining vents.
automatic air vent
4. Open
tank systems only) one turn.
5. Open other vents:
a. Starting on the lowest floor, open air vents one at a time until water
squirts out.
b. Repeat with remaining vents.
6. Refill to correct pressure.
Part Number 550-142-900/0519
air vents
and boiler drain cock.
Correct pressure will vary with each
Figure 9
(diaphragm-type or bladder-type expansion
(continued)
Inspect system water piping
After filling the boiler and system with water,
piping
throughout the system for leaks. If found, repair
immediately. Repeat this inspection after the boiler has
been started and the system has heated up.
6
, in sug-
through
Inspect base insulation
Check to make sure
all four sides of the base. If insulation is damaged or
do not
displaced,
insulation.
inspect all
Leaks must be repaired at once.
Failure to do so can damage the
boiler, resulting in substantial prop-
erty damage.
petroleum-based
Do not use
cleaning or sealing compounds
in boiler system. Severe damage to
boiler will occur, resulting in sub-
stantial property damage.
The boiler contains ceramic fiber
and fiberglass materials. Use care
when handling these materials per
page 57
instructions on
manual. Failure to comply could
result in severe personal injury.
Failure to replace
damaged insu-
lation or reposition insulation can
result in a fire hazard, causing severe
personal injury, death or substantial
property damage.
base insulation is secure
operate boiler. Replace or reposition
of this
against
29

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cga-25Cga-3 cga-4Cga-5Cga-6Cga-7Cga-8

Table of Contents