Drilling The Piping, Condensation Hose And Cable Feed-Through; Connection The Coolant Pipes; Connecting And Disconnecting The Coolant Pipes7 - Qlima SCJA2516 Installation Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

SCJA4816
6.2

Drilling the piping, condensation hose and cable feed-through.

a.
Determine the positions of the holes according to the diagram detailed in Fig. 8. Drill one (1) hole (≥
85 mm) slanting slightly downwards to outdoor side, this will prevent water to come indoors (fig 9).
b.
Always use wall hole conduit when drilling metal grid, metal plate or the like.
7.
CONNECTING THE COOLANT PIPES
7.1
Connecting and disconnecting the coolant pipes.
G
TAKE CARE
Connecting the coolant pipes of an air conditioner must be carried out in accordance with the
applicable national regulations and laws. Connecting the coolant pipes may only be carried out
by an authorised fitter.
G
TAKE CARE
The piping package, coupled to the interior unit, is heavy. Never let the piping package hang
freely from the interior unit. Support the whole piping package during installation of the interior
unit. The weight of the piping package can cause the piping on the interior unit to bend and
even break. Damage to the piping on the interior unit due to unprofessional installation and is
not covered by the guarantee.
G
TAKE CARE
For your safety, always wear safety eye wear and work gloves when connecting the pipes. The
piping is coupled the interior unit at the factory. Read through the "quick installation guide" to
understand how the piping and power cable must be connected to the exterior unit.
4
28
28
Wall
Outdoor
Indoor
≥5°
Figure 9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scja3116Scja4816

Table of Contents