Download Print this page

Cisco Catalyst 2900 Mounting Instructions

Rack-mounting instructions
Hide thumbs Also See for Catalyst 2900:

Advertisement

Quick Links

C H A P T E R
3
Rack-Mounting Instructions
This chapter describes the procedures to rack-mount the Catalyst 2900 at your site.
A rack-mount kit is included for mounting the switch in a standard 19-inch equipment rack
with two unobstructed outer posts. This kit is not suitable for use with other racks, such as
telco-type equipment racks, or those with obstructions (such as a power strip) that could
impair access to the switch modules and power supplies.
Caution
Before installing the chassis in a rack, read the section "Safety with Electricity"
in the chapter "Installation Overview" to familiarize yourself with the proper site and
environmental conditions. Failure to read and follow these guidelines could lead to an
unsuccessful installation and possible damage to the system and components.
Rack-Mounting the Switch
Use the following procedure for attaching the rack-mount kit and installing the switch in a
wiring closet rack. Two or more people are needed to perform this procedure.
Be sure you have at least three or four feet of clearance behind the rack for maintenance.
The intake and exhaust ports for cooling air are located on the front and rear and both sides
of the chassis, so multiple switches can be stacked with little or no clearance in a rack. The
chassis is 3.4 inches (8.5 cm) high.
Rack-Mounting Instructions 3-1

Advertisement

loading

Summary of Contents for Cisco Catalyst 2900

  • Page 1 C H A P T E R Rack-Mounting Instructions This chapter describes the procedures to rack-mount the Catalyst 2900 at your site. A rack-mount kit is included for mounting the switch in a standard 19-inch equipment rack with two unobstructed outer posts. This kit is not suitable for use with other racks, such as telco-type equipment racks, or those with obstructions (such as a power strip) that could impair access to the switch modules and power supplies.
  • Page 2: Tools For Installation

    Tools for Installation Before rack-mounting the Catalyst 2900, confirm that your rack-mount configuration conforms to the following criteria: • If the switch is installed in a closed or multiunit rack assembly, the ambient operating temperature of the rack environment may be higher than the ambient room temperature.
  • Page 3 Installing the L Brackets • Antistatic mat or antistatic foam in case you need to remove switch modules to troubleshoot the installation • Your own ESD grounding strap or the disposable ESD strap included with the system If you are installing the chassis in a rack, you will also need the following: •...
  • Page 4 Figure 3-1, Figure 3-2, and illustrate attaching the rear of the switch to the rack. You can also attach the front of the switch to the rack, depending on the configuration of your rack. Figure 3-1 Attaching the L Bracket 3-4 Catalyst 2900 User Guide...
  • Page 5: Installing The Chassis In The Rack

    Installing the Chassis in the Rack Attach the left and right L brackets using the six M4 Phillips countersunk-head Step 6 screws provided in the rack-mount kit. No shelf is required with this assembly; the L brackets support the chassis in the Note rack.
  • Page 6 — If the rack is provided with stabilizing devices, install the stabilizers before mounting or servicing the unit in the rack. This concludes the rack-mount installation. 3-6 Catalyst 2900 User Guide...
  • Page 7 Installing the Chassis in the Rack Figure 3-2 Installing the Switch in the Rack Rack-Mounting Instructions 3-7...
  • Page 8 Installing the Chassis in the Rack 3-8 Catalyst 2900 User Guide...