Trane GETB Installation Manual page 7

Water-source heat pump
Table of Contents

Advertisement

12 1/2"
(318)
8" (203)
3 3/4"
(95)
R
S
OPTIONAL
DUCT OPENING
1" (12.7) DUCT
COLLAR
B
TOP
SWAGE 3" (76)
SUPPLY-AIR
OPENING
LOW VOLTAGE
CONNECTION BOX
FOR THERMOSTAT
C
CONTROL BOX
THROWAWAY
FILTER
D
CHASSIS
ACCESS
PANEL
4 3/4"
CONNECTION
(121)
3/4" (19) O.D.
F
E
FRONT
WSHP-SVN08B-EN
Dimensions
GET 009-036
009, 012
VARIES DEPENDENT
ON RISER O.D.
015-018
D
024-036
RETURN
SUPPLY
DRAIN
1/2" (12.7) O.D.
ELECTRIC CONDUIT
1" (25.4)
G
RISER CONNECTION
1/2" (13) NPTE = 009-018
3/4" (19) NPTE = 024,036
DRAIN
GET
A
B
16 1/4" (413) 16 1/4" (413) 8 1/8" (206)
18" (457)
20" (508)
24" (610)
24" (610)
11" (279) FOR 80" (2032) CABINET HEIGHT
G
3" (76) FOR 88" (2235) CABINET HEIGHT
SUPPLY-AIR OPENINGS AND RISER LOCATIONS CANNOT
H
BE ON THE SAME SIDE OF THE UNIT.
RISER LOCATION CAN BE ON ANY SIDE EXCEPT FRONT,
J
AND MAY BE SUPPLIED BY TRANE OR BY OTHERS.
NOTE:
RIGHT RISER
LOCATION SHOWN
IN FRONT AND RIGHT
VIEWS.
RIGHT SIDE
C
D
39 1/8" (994)
14 3/4" (375)
10" (254)
40 5/8" (1032) 18 3/4" (476)
12" (305)
49 5/8" (1260) 22 5/8" (575)
A
E
F
3/4" (19)
3/4" (19)
3/4" (19
7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vertical stack getb

Table of Contents