Test Run - Atlas PX-16A Installion / Operation Manual

Table of Contents

Advertisement

1.
Fill oil adjustment
a. Turn on the power after connecting oil system correctly. Press the Up button,
and check the rotated direction of the motor (This is right if lift is upward,
otherwise, it is wrong direction of the motor). Shut off power and exchange the
phase connection if the direction is wrong.
b. Fill the reservoir with hydraulic oil. In consideration of power unit's durability
and keep the equipment running in the perfect condition, please use
Hydraulic Oil 46#.
c. Lower the platforms to the lowest position.
2.
Synchronous adjustment
a. Turn the handles of the shutoff valves to the position as Fig. 36 (Normal
working position), press the UP button until the both platforms up to the
position that the high limit switch stop the lifting, at this time, press the UP
button and the red button (See Fig. 35) beside the oil water separator
together to raise the lift to the highest position
Red button (SB)

Test Run

Test Run
Left
Fig. 35
PX-16A
Right
29

Advertisement

Table of Contents
loading

Table of Contents