NOTE: the system will not provide airflows above the Max
Airflow Value.
• 3 Ton Models = 1,400 CFM
• 4 Ton Models = 1,760 CFM
• 5 Ton Models = 2,200 CFM
5) Use the Cool Cloud HVAC phone application to
configure/test furnace operations.
NOTE: The phone application cannot test a non-communicating
outdoor unit.The thermostat will be required for outdoor unit
testing.
Charging
a) Two-stage outdoor units:
a. Provide a second stage cooling call from
the thermostat and charge accordingly.
b) Single-stage outdoor units:
a. Provide a cooling call from the thermostat
and charge accordingly.
Gas Furnace Testing
a) Two stage operation using the Cool Cloud HVAC
application:
a. Select the gas heat icon after entering
the furnace menus.
b. Select any value less than 50% for low
stage operation and any value greater
than 50% for high stage operation.
6) Confirm thermostat heating and cooling calls
function properly with equipment.
q
S
g
uiCk
tArt
uide for
o
u
)
utdoor
nit
EXTREMELY IMPORTANT: The furnace only requires a single
W input for 2 stage gas heat control. Internal algorithms will
control staging of the gas furnace automatically
1) Connect all necessary thermostat wires to the
thermostat connector on the furnace control as shown
in the following diagram.
g
h
o
S
AS
eAt
nly
etup
2) Download the Cool Cloud HVAC phone application
and use it to configure/test furnace operations.
NOTE: When new versions of Bluetooth Communication
Software and Furnace Control Software are available, the
phone application notifies the user. Software updates are
classified as either optional or mandatory and installed by
using the phone application. Ensure all mandatory software
updates have been installed. Review notes for optional
software updates and install if necessary.
Gas Furnace Testing
a) Two-stage Operation using the Cool Cloud HVAC
application:
a. Select the gas heat icon after entering the
furnace menus.
b. Select any value less than 50% for low
stage operation and any value greater
(n
than 50% for high stage operation.
o
3) Confirm thermostat heating call functions properly
with equipment
23
Indoor
Board Terminal
24 VAC
Connections
Thermostat
R
R
C
C
Optional
G
G
Optional
W
W
Dehum
DH/Y2
Gas Heat Only
Figure 25