Download Print this page

Required Tools; Upgrading The Nam Software - Cisco MEM-C6KNAM-2GB Upgrade Installation

Advertisement

Required Tools

Required Tools
The following tools are required to perform the NAM memory kit installation:
Caution
Always use an ESD wrist strap when handling modules or coming into contact with internal components.
Warning
Blank faceplates and cover panels serve three important functions: they prevent exposure to
hazardous voltages and currents inside the chassis; they contain electromagnetic interference (EMI)
that might disrupt other equipment; and they direct the flow of cooling air through the chassis. Do not
operate the system unless all cards, faceplates, front covers, and rear covers are in place.
Statement 1029
Hazardous voltage or energy is present on the backplane when the system is operating. Use caution
Warning
when servicing. Statement 1034
Only trained and qualified personnel should be allowed to install, replace, or service this equipment.
Warning
Statement 1030

Upgrading the NAM Software

Before you upgrade the NAM memory, you must first upgrade the NAM software to version 3.6(1b).
Procedures for upgrading the NAM software are contained in the Catalyst 6500 Series Switch and Cisco
7600 Series Router Network Analysis Module Installation and Configuration Note.
Problems can occur if you do not upgrade the software prior to upgrading the memory.
Note
After completing the software upgrade, you need to check amount of memory installed on the NAM
module. Check the amount of memory as follows:
root@nam_machine.cisco.com# show version
NAM Application image version: 3.6(1b)
Maintenance image version: 2.1(3)
NAM Daughter Card Micro code version: 1.34.1.28 (NAM)
PID: WS-SVC-NAM-2
Memory size: 1024MB
Disk size: 40GB
Installed patches:
No patches are installed on this system.
root@nam_machine.cisco.com#
Network Analysis Module Memory Upgrade Installation Note
6
Antistatic mat or foam pad to support and protect the removed NAM
3/16-inch flat-blade screwdriver for the captive installation screws on the NAM
Your own ESD-prevention equipment or the disposable grounding wrist strap included with all
upgrade kits, field-replaceable units (FRUs), and spares
78-18630-01B0

Advertisement

loading