Installation And Setup Instructions; Unpacking The N3400 - IBM N3400 Installation And Setup Instructions

Table of Contents

Advertisement

Installation and setup instructions

Use these instructions to install and set up your N3400 storage system.

Unpacking the N3400

Use these instructions to unpack the N3400.
Important: If your system was shipped already assembled and cabled in a rack, go directly to "Setting
up and booting the system" on page 18.
Notes:
v The contents of the box will differ depending on the model you purchased. See step 2 on page 2 for a
list of contents for specific models.
v Small Form Factor Pluggable (SFP) modules are either in the accessory box or are installed in the fiber
ports of the system unit.
18-32 kg (39.7-70.5 lbs)
1. Lift the box from the crate, as shown in Figure 1. The contents will remain in place.
Figure 1. N3400 packaging
© Copyright IBM Corp. 2010, 2011
CAUTION:
The weight of this part or unit is between 18 and 32 kg (39.7 and 70.5 lb). It takes two
persons to safely lift this part or unit. (C009)
Accessory kit:
- IBM rail kit
- power cable
- DB-9 to RJ-45
console adapter
- serial null modem
cable
- cable management
arms
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents