Summary of Contents for Kohler Englefield Valencia Elite
Page 1
INSTALLATION INSTRUCTIONS VALENCIA ELITE SHOWER Square Sliding Englefield has a history of making superb showers and their popularity is testament to their quality and affordability. It’s the details that Englefield cares about - from pioneer- ing the latest technology, to innovative design, it’s all to make your showering experience the very best it...
VALENCIA ELITE Square Sliding INSTALLATION INSTRUCTIONS BEFORE YOU BEGIN Before installing the shower please read these instructions carefully to familiarise yourself with the required tools, materials and installation sequences. Please leave these instructions for the consumer after installation. Refer to the separate care and maintenance guide for important care and cleaning information.
VALENCIA ELITE Square Sliding INSTALLATION INSTRUCTIONS CONSTRUCTION REQUIREMENTS ATTENTION Due to the weight of the glass panels Englefield strongly recommends constructing double studs (as below) to fix the wall retainers to. Size Dim ‘A’ Dim ‘B’ 900 x 900 1000 x 1000 1000 1000 Double...
INSTALLATION INSTRUCTIONS VALENCIA ELITE Square Sliding INSTALLATION - Options OPTION 1 - Acrylic Wall & Tray Tray: For tray installation refer to the instructions supplied with the tray. Wall: For wall installation refer to the instructions supplied with the wall. - Proceed to Door and Return Installation.
Page 6
INSTALLATION INSTRUCTIONS VALENCIA ELITE Square Sliding INSTALLATION Caution: Ensure tray or tiled floor is level & walls are vertical & square. ± 0 mm ± 0 mm Tip: Cover the waste to prevent the loss of small parts. If installing onto a tray protect the tray surface during installation.
Page 7
VALENCIA ELITE Square Sliding INSTALLATION INSTRUCTIONS 3 mm 10 mm Position the wall channels on the wall. The flange with pre-drilled holes should face inside the shower enclosure. Using a level, make sure that the channel is upright. Mark the position of the fixing holes down the centre of the channels, then remove the wall channels.
Page 8
VALENCIA ELITE Square Sliding INSTALLATION INSTRUCTIONS Logo badge on outside of shower (CleanLess ® glass protection to inside) Long leg to outside Ensure that the panels are correctly oriented, with the logo badges and long leg of the seal cap on the outside of the glass. Install the panel assemblies into the wall channels.
Page 9
VALENCIA ELITE Square Sliding INSTALLATION INSTRUCTIONS Install the corner brackets in position. Secure the corner brackets with the washers and shortest screws (8mm length). Install the caps over the washers. Adjust the frame so that it is in the correct position. Page 8 ENGLEFIELD...
Page 10
VALENCIA ELITE Square Sliding INSTALLATION INSTRUCTIONS Ø 3 mm From the inside of the shower enclosure, drill four 3mm holes in the door frame. The hole locations are centre marked on the inside of the wall channel. Caution! Take care not to drill all the way through or damage the shower. Insert the screws (12mm length) and tighten.
Page 11
VALENCIA ELITE Square Sliding INSTALLATION INSTRUCTIONS Hang the doors onto the top rail. Note! Make sure that the roller adjusting screws are facing downwards. Adjust the top rollers with the adjusting screw until the bottom rollers easily clip into the bottom rail. Adjust the rollers to give a smooth, even action when the door is opened and closed.
Page 12
VALENCIA ELITE Square Sliding INSTALLATION INSTRUCTIONS Unlocked Rotate 90° Locked Fit the seals. Note! The longer seals go on the doors. Trim any excess material. Lock the top roller assemblies in position by turning the lock through 90º. Fit the roller covers. Make sure that the doors open and close correctly.
Page 13
VALENCIA ELITE Square Sliding INSTALLATION INSTRUCTIONS Full length Full length 200mm up 200mm up Full length Full length wall board finishing wall retainer strip silicone or liner channel adhesive silicone Apply sealant in accordance with the sealant manufacturer’s instructions. Apply to the locations shown above.