General Points; Delivered Condition; Tank Installation - Bosch DHW Tank QWST120 O Installation And Maintenance Instructions Manual

Table of Contents

Advertisement

2

General points

2.1

Delivered condition

The DHW tank QWST120 O Is delivered as a fully
assembled unit.
Additional components supplied with the tank:
1
125 psi P and T valve
3
3/4" brass couplings
1
3/4" brass tee
1
Honeywell L4006 adjustable differential tank
aquastat
1
Aquastat mounting bracket and 4 mounting screws
3
Adjustable tank leg leveling bolts
1
Roll of high quality Teflon tape
2.2

Tank installation

Select a dry, frost free room for installation. The tank
must not be allowed to freeze, or it must be drained or
protected appropriately when not in operation. The floor
must be level and able to carry the weight of the unit.
When installing the heating boiler and DHW tank,
observe the minimum clearance requirements for
assembly and service (
16"
(406 mm)
16"
(406 mm)
Fig. 1
Minimum space requirements for installation
and maintenance
6 720 648 071 (2012/03)
Fig. 1).
min. 4"
(102 mm)
6 720 648 100-14.1ITL
General points
5

Advertisement

Table of Contents
loading

Table of Contents