Maintenance Schedule - Hach Polymetron 9610sc Maintenance And Troubleshooting Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 3
Table of contents
Safety information
Refer to the installation user manual for general safety information, hazard descriptions and
precautionary labels descriptions.
Maintenance
Multiple hazards. Only qualified personnel must conduct the tasks described in this section of the
document.

Maintenance schedule

Table 1
shows the recommended schedule of maintenance tasks. Facility requirements and
operating conditions may increase the frequency of some tasks.
Task
Clean external surfaces
on page 4).
on page 5).
Replace the reagents
(Replace the analyzer bottles
on page 7).
Replace the standards
(Replace the analyzer bottles
on page 7).
Clean or replace the sample (y-strainer) filter
Replace the fan filter
Replace the reagent air filter
Replace the tubing
Replace the stir bar
Replace the sample cell
1
With 10 minute cycles
2
With 15 minute cycles
3
With one calibration per week
on page 4
Table 1 Maintenance schedule
(Clean the instrument
Replacement parts and accessories
D A N G E R
30 days 60 days
X
on page 15
90 days
X
X or as needed
1
2
X
3
X
X or as needed
X or as needed
365 days
X
X
X
X
English 3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Polymetron 9611sc

Table of Contents