INTRODUCTION
PRE-INSTALLATION
INSTALLATION
P/N 315-050338-0
The Model FMT-A-ADPT module (as shown in Figure 1) from Siemens
Industry, Inc., provides the FMT with Class A riser capability. The
telephone riser is supervised by the primary FMT.
The FMT-A-ADPT is shipped with the bracket for use on the CC-2 or
CC-5 Card Cages attached to the FMT-A-ADPT board.
T T T T T o use the FMT
o use the FMT
o use the FMT
-A-ADPT on a CC-2 Card Cage,
-A-ADPT on a CC-2 Card Cage,
-A-ADPT on a CC-2 Card Cage, y y y y you must place it in
o use the FMT-A-ADPT on a CC-2 Card Cage,
o use the FMT
-A-ADPT on a CC-2 Card Cage,
Slot 1 (terminals 9-1
Slot 1 (t
Slot 1 (t
Slot 1 (t
Slot 1 (t
erminals 9-1
erminals 9-1
erminals 9-1
erminals 9-16) of the top Double Header; on a CC-5 Card
Cage y
Cage y
ou must place it in Slot 5 (t
ou must place it in Slot 5 (t
Cage y
Cage you must place it in Slot 5 (t
Cage y
ou must place it in Slot 5 (t
ou must place it in Slot 5 (terminals 9-1
The FMT-A-ADPT is shipped with two removable terminal plugs
(see Figures 5 and 6) that are installed in J1 and J2. Remove the
terminal plug from the CC-5/CC-2 header (terminals 9-16) where the FMT-A-ADPT will
be installed. Transfer the existing field wiring in the connector to connector J2 as
explained in the wiring section and discard the connector that was removed.
Remove all system power before installation, first battery then AC. (To power up,
connect the AC first, then the battery.)
Install the FMT-A-ADPT (Refer to Figure 2) in the top header of the CC-5/CC-2. Insert
the female plug on the end of the FMT-A-ADPT into the appropriate top header (Slot 5
SLOT FOR CAPTIVE
SCREW IN SLOT 1 OF
CC-2 TOP DOUBLE HEADER
SLOT FOR CAPTIVE
SCREW IN SLOT 5 OF
CC-5 TOP DOUBLE HEADER
J1
J4
J2
J3
(FEMALE PLUG)
Figure 2
FMT-A-ADPT
6) of the top Double Header; on a CC-5 Card
6) of the top Double Header; on a CC-5 Card
6) of the top Double Header; on a CC-5 Card
6) of the top Double Header; on a CC-5 Card
erminals 9-1
erminals 9-1
erminals 9-1
erminals 9-16) of the top Double Header
CC-5 CARD CAGE
CAPTIVE SCREW
INSTALL FMT-A-ADPT
MODULE IN SLOT 5
OF CC-5 CARD
CAGE, AS SHOWN.
FOR CC-2 CARD CAGE,
INSTALL
FMT-A-ADPT
MODULE IN SLOT 1
AND USE THIS SPACE
FOR CAPTIVE SCREW.
ANY XLS SINGLE
SLOT MODULE
Figure 3
FMT-A-ADPT Installed in CC-5
Building
Building T T T T T ec
Building
Building
Building
Figure 1
ou must place it in
ou must place it in
ou must place it in
ou must place it in
FMT-A-ADPT PCB
6) of the top Double Header. . . . .
6) of the top Double Header
6) of the top Double Header
6) of the top Double Header
CC-5 TOP DOUBLE
HEADER
FMT-A-ADPT MODULE
PLUGS INTO TOP
DOUBLE HEADER OF
SLOT 5 OF CC-5 OR
SLOT 1 OF CC-2 CARD
CAGE.
CC-5 BOTTOM
HEADER
Siemens
Siemens Industry
Siemens
Industry, , , , , Inc.
Industry
Industry
Siemens
Siemens
Industry
ec
ec
echnologies Di
hnologies Di
hnologies Di
hnologies Division
ec
hnologies Di
FMT-A-ADPT
J1
1
E6
E2
E3
E4
E7
E5
J4
16
9
J2
16
9
J3
Inc.
Inc.
Inc.
Inc.
vision
vision
vision
vision

Advertisement

loading

Summary of Contents for Siemens FMT-A-ADPT

  • Page 1 AC first, then the battery.) Install the FMT-A-ADPT (Refer to Figure 2) in the top header of the CC-5/CC-2. Insert the female plug on the end of the FMT-A-ADPT into the appropriate top header (Slot 5 CC-5 CARD CAGE...