Start-Up; Test Of The Automated System; Manual Operation; Returning To Normal Operation - Genius Roller Series Manual

Automation systems roller
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 8
For systems with 110° and 140° opening it is possible to fit the (optional)
open (Fig. 14 rif. ) and close (Fig. 14 rif. ) mechanical stops inside
the housing case. For installation details, please refer to the relative
instructions.
Grease the operator pinion and the fixing pivots of the two levers.
Do not oil the gears of the gear plate.
Do not lubricate the release system for any reason.
4.
Fasten the box cover by means of the screws supplied (Fig. 15).
5.
Install the second operator, if required, repeating the operations
described above.
6.
Install the electronic control unit, referring to the dimensions indicated
in the relevant instructions.

6. START-UP

Before attempting any work on the system or on the operator, always
turn off power.
Observe points 10, 11, 12, 13, 14 of the GENERAL SAFETY OBLIGATIONS.
Observing the instructions in Fig.3, lay the raceways and make the electric
connections of the control board to the selected accessories.
Always separate power cables from control and safety cables (push-button,
receiver, photocells, etc...). To prevent any electric noise whatever, use
separate sheaths.
1.
Program the control board according to your needs observing the
concerning instructions.
2.
Switch on power to the system and check the condition of the LEDs
according to the table of the control board instructions.

7. TEST OF THE AUTOMATED SYSTEM

Check operating efficiency of the automated system and all accessories
connected to it.
Hand the "User's Guide" page to the Client, explain correct operation and
use of the operator and indicate the potentially dangerous areas of the
automated system.

8. MANUAL OPERATION

Should the need arise to operate the gate manually because of a power
failure or malfunction, the release device with key fitted on the support
bracket (Fig. 1 rif.
) makes it possible to release the system both from the
inside and from the outside.
To operate the leaf manually, proceed as follows:
Cut power to the system.
open the lid of the lock (Fig. 16 rif.
insert the release key in the lock (Fig. 16 rif.
turn the key in the direction of the post, as far as it will go (Fig. 16 rif.
pull the lever out (Fig. 16 rif.
operate the leaf manually.
Fig. 14

9. RETURNING TO NORMAL OPERATION

To avoid an involuntary pulse from activating the gate during the
manoeuvre, before re-locking the operator , switch off power to the
system.
push the lever back into its home position (Fig. 17 rif.
insert the release key in the lock and turn it in the direction opposite the
Fig. 15
post, as far as it will go (Fig. 17 rif.
operate the leaf manually until the lock is engaged in the locking bracket
(Fig. 17 rif.
)
close the lid of the lock.
make sure that the gate cannot be moved manually.
restore power to the system.

10. SPECIAL APPLICATIONS

There are no special applications.
To ensure correct long-term operation and a constant level of safety, we
advise you to generally control the system at least every 6 months. In the
"User's Guide" booklet, there is a form for recording jobs.
The User must not in any way attempt to repair or to take direct action
and must solely contact qualified GENIUS personnel or GENIUS
service centres.
10
)
)
)
)
)

11. MAINTENANCE

12. REPAIRS

)
Fig. 16
Fig. 17

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Roller 230vRoller lentoRoller 24vRoller 115v

Table of Contents