General Installation Skill Risk of fire or explosion. Do not Information Requirements smoke or use open flames in or around this system. This system is not intended for use in hazardous Thank you for purchasing your The installation of a basin system locations per NFPA 70 National Low Pressure Sewer Basin System.
Page 3
a properly maintained piloted Basin hole saw sized per chart below, Risk of electrical shock or drill a hole through the basin Installation electrocution. May result in wall. If using a fiberglass basin, serious injury or death or fire Instructions clean cut hole and apply a sealant hazard.
Page 4
B. Stone or gravel crushings with Application: Backfill angular particle size of not These pump systems are designed less than 1/8" nor more than Instructions for pumping effluent or sewage 1/2" diameter, washed and water with a pH ranging from 5 free flowing, is acceptable as to 9, specific gravities from 0.9 to an alternative material.
Page 5
unit down and ensure the ball check Step 4: valve sealing flange aligns and It is recommended that the Risk of electrical shock or connects properly with discharge. customer furnish and install a electrocution. result conduit seal outside the basin in serious injury or death or to prevent surface water from fire hazard.
Page 6
Step 2: HPGR200 & HPD200 Internal Basin Open the shut-off valve to the 230 VOLT - 1 PHASE PUMP Connections discharge line. BLACK WHITE GREEN Step 3: Step 2: Turn H-O-A switch to the Off GREEN Connect pump power, seal failure/ position and turn on main breaker.
discharge. Pumps should alternate assembly so that the ball check out of the basin and hang the starting, between each other, upon valve disengages the discharge Off and On floats from your successive pump-down cycles. elbow (approximately hand. Turn the H-O-A switch To check override level, set both inches).
start capacitor and start relay return the H-O-A switch to Pump for failure. Auto and observe operation. Troubleshooting 5. Single phase pump may be 2. Pump motor may have failed. miswired to panel. The white, 3. Start component(s) failure for black, and red pump power single phase pumps.
Page 9
Polyethylene Simplex Parts List ORDERING REPLACEMENT PARTS: Product improvements are made from time to time. The latest part design will be fur- nished as long as it is in ter change able with the old part.When ordering re place ment parts, always furnish the fol low ing information: (1) pump serial num ber, (2) pump model and size, (3) part description, (4) part number, (5) im pel ler diameter (if ordering impeller), (6) quan ti ty required, and (7) shipping instructions.
Page 10
Fiberglass Simplex Parts List ORDERING REPLACEMENT PARTS: Product improvements are made from time to time. The latest part design will be fur- nished as long as it is in ter change able with the old part.When ordering re place ment parts, always furnish the fol low ing information: (1) pump serial num ber, (2) pump model and size, (3) part description, (4) part number, (5) im pel ler diameter (if ordering impeller), (6) quan ti ty required, and (7) shipping instructions.
Page 11
Fiberglass Duplex Parts List ORDERING REPLACEMENT PARTS: Product improvements are made from time to time. The latest part design will be fur- nished as long as it is in ter change able with the old part.When ordering re place ment parts, always furnish the fol low ing information: (1) pump serial num ber, (2) pump model and size, (3) part description, (4) part number, (5) im pel ler diameter (if ordering impeller), (6) quan ti ty required, and (7) shipping instructions.
Pentair Hydromatic will cover only the lower seal and labor thereof for all dual seal pumps. under no circumstance will Pentair Hydromatic be responsible for the cost of field labor, travel expenses, rented equipment, removal/reinstallation costs or freight expenses to and from the factory or an authorized Pentair Hydromatic service facility.