10.2 Indications to the spare part order
Spare parts are available from the supplier.
Standard commercially available parts are to be
purchased in accordance with the model type.
The ordering of spare parts should contain the follow-
ing details:
1. Pumptype
e.g. SFL1550S440
2. Pump No.
e.g. 04196530
The date of the construction year is a component
of the pumps type number.
3. Voltage, Frequency and Power
Take item 1, 2 and 3 from the nameplate
4. Spare part with item No.
e.g. Intake cover item No. 52
11 Repair Instructions / Replacing shaft
clamps and shafts
1 = Shaft clamp
2 = Insert / extension shaft
3 = Motor shaft / Insert shaft
11.1 Dismantling the insert shaft or extension
shaft
– Disconnect the submergible pump from the mains
both electrically and mechanically.
– Remove pump from system. Secure pump against
tipping over, i.e. use ropes to secure pump.
– Set the pump down on the fan cover. Dismantle
the pump unit and the extension pump body (if ap-
propriate).
Wear safety gloves!
Risk of injury due to sharp edges on pump compo-
nents, i.e. impeller blades.
– Loosen the screws on the shaft clamp (1) one after
the other.
Do not, under any circumstances, remove the screws
completely, danger of injury
– Remove the extension shaft (2) and shaft clamp
(1).
– Dismantle the pump body.
– Loosen the screws on the shaft clamp (1) (see
above), pull the insert shaft (2) off the motor shaft
(3).
BAS6530
1
3
2
!
Edition
11.2 Assembling the insert shaft and motor shaft
Clean the contact surfaces of the insert shaft (2)
(inside) and the motor shaft (3). They must not be
lubricated or oiled.
– Set the motor down on the fan cover.
– Position the shaft clamp (1) (use a new shaft
clamp) in the centre of the cranked clamping diam-
eter (2) of the insert shaft.
– Insert the motor shaft (3) into the insert shaft (2).
– Tighten:
Mark the first screw and tighten all the screws
evenly by hand, one after the other in a clockwise
direction (not cross-ways).
up to 16.9 HP
-
Use a torque screwdriver to tighten each screw first
with 1.5 ft. lbs. (2 Nm) then with 2.6 ft. lbs. (3.5
Nm) and finally with 3.7 ft. lbs. (5 Nm) (in a clock-
wise direction again).
Repeat the last turn with 3.7 ft. lbs. (5 Nm) 3 times.
> 16.9 HP
-
Use a torque screwdriver to tighten each screw first
with 1.5 ft. lbs. (2 Nm) then with 5.3 ft. lbs. (7 Nm)
and finally with 9 ft. lbs. (12 Nm) (in a clockwise di-
rection again)
Mount the pump body.
-
In the case of pumps with an extension body, the
-
assembly and tightening of the second shaft clamp
is carried out as before.
The remainder of the reassembly process is to be
completed in the opposite order of the prior described
dismantling process.
Note torques for the screw connections!
When putting the pump back into use, make sure the
direction of rotation is correct!
Tightening torques for screwed connections
Thread
M5
M6
- 
Strength
4.8
8.8
classes
Tighten-
2.2
3.3
ing
(3)
(4.5)
torque
ft. lbs.
(Nm)

12 Disposal

When disposing of the pump or the packaging materi-
als the local and national regulation for proper dispos-
al must be complied with.
Prior to its disposal, the pump must be completely
drained and decontaminated if necessary.
04/2019
ATTENTION
ATTENTION
M8
M10
M12 M16
8.8
10.0
8.8
8.8
8 (11)
22 (30)
59
44
Item 16
Item.18
(80)
(60)
15 (20)
Item.
83
Page 9 of 11
M16
44 (60)
Item. 79
SFL
74 (100)
Item. 77
STA

Hide quick links: