Download Print this page

Panasonic CZ-256ESMC2U Installation Instructions page 4

Hide thumbs Also See for CZ-256ESMC2U:

Advertisement

Wiring
(continued)
Pass
through the power-in port.
Power supply terminal board (TB1)
ON
L
N
OFF
Connect the earth wiring if the noise is induced to
this unit.
 If the power supply wiring is mistakenly connected
to a terminal board other than the power supply
terminal board, the devices connected to this
controller or this controller will malfunction.
Connecting to External Equipment
• Non-voltage contact "a"
• Keep the external I/O wiring lengths of 66 ft. (20 m) or less. If a longer length is needed, use a Communication Adaptor or relay.
• A voltage of DC5 V (approx. 10 mA) is applied to the contact to detect the input signal.
• Do not apply an external voltage to the input terminal.
• The contact allowable voltage and current for the output signal terminal are max. DC30 V and 0.5 A respectively.
Pulse meter input
(Non-voltage contact "a" Pulse)
Common (COM1)
Pulse meter input (Pi1)
Pulse meter input (Pi2)
Pulse meter input (Pi3)
• Minimum pulse width: 30 msec
or more, or 100 msec or more
(selectable by setting)
• Minimum pulse interval: 1 sec
Setting and Test Operation
 Turn on all of the indoor units and the outdoor units.
 Turn on the Communication Adaptor (only when
connected), and make the necessary settings.
(See "Installation Instructions" supplied with the
Communication Adaptor.)
 Turn on this unit.
 Attach the power switch cover to the original position.
• Do not allow the wirings to be caught.
 Refer to "Quick Reference" and check the following.
• Check if the clock setting and the number of connected
units are correctly displayed.
© Panasonic Corporation 2016
Printed in Japan
Power switch
Power supply
wiring
(AC24 V 60 Hz)
Clamper
(supplied)
Clamper
(supplied)
Equipment side
7
8
9
10
ON
OFF
LAN
terminal
Fix
securely.
Signal terminal board (TB2) connection
Connect the shield wiring for the inter-
unit control wiring to ground (FG
Connect to inter-unit control wiring (LINK1)
Connect to inter-unit control wiring (LINK2)
0
14
1
15
2
16
3
17
4
18
5
19
6
20
7
21
8
22
9
23
10
11
Signal terminal board (TB2)
25
12
26
13
• Set the central address.
• Make other necessary settings (unit name, area setting,
distribution setting, etc.).
• Check if the indoor unit, etc. can be operated properly
using this unit, and correct statuses are displayed.
 Refer to one of "Service Manual", "Test Run
Service Manual" and "Technical Data", and check
the following.
• Make the communication setting with the air conditioner.
• Check and confi rm the connection confi guration.
4
Use these screws when connecting the shield
wiring to ground. (FG*
Inter-unit
control
wiring
Communication
LAN
Cable
Adaptor control
wiring
E xternal

equipment
connection
terminal
(See "Connecting to External
Equipment")
Signal terminal board
(TB2)
FG*
4
) .
*4
FG*
U1
+
U2
-
U1
U2
External output
(Non-voltage contact "a" Static)
Common (COM2)
17
Digital output1 (DO1)
18
Digital output2 (DO2)
19
• Minimum application load: DC5V 1mA
External input
*5
(Non-voltage contact "a" Static)
Common (COM3)
20
21
Digital input1 (Di1)
22
Digital input2 (Di2)
Digital input3 (Di3)
23
*5: When performing the demand control,
connect to External input (Di) terminal.
*4: Functional Ground
4
)
4
Connect the Communication
Adaptor control wiring.
(ADAPT +,-,FG*
4
)
Equipment side
Equipment side

Advertisement

loading