Selecting A Mounting Location - Pentair EVERPURE LVRO-75H Series Manual

Reverse osmosis (ro) system
Table of Contents

Advertisement

Tools Required
• Hand or Electric Drill
• Adjustable Wrenches (2)
• File
• Pencil
• Utility Knife or Tube Cutter
(for plastic tubing)
Optional Materials
(For sinks without extra hole for faucet)
• Hand or Electric Drill
• Plumber Tape
• Drill Bits: 1/4-inch and
3/4-inch
NOTE: Not all tools listed will be necessary for installation.
Read installation procedures before starting to
determine required tools.
DIMENSIONS
15.50
(394 cm)
2
LVRO-75HE REVERSE OSMOSIS SYSTEM INSTALLATION AND OPERATION GUIDE
• Phillips Screwdriver
• Towel
• Safety Glasses
• Tape Measure
• Drill Bits: 1/8-inch,
1/4-inch and 3/8-inch
• Center Punch
• Respirator
• 1-3/8 inch Bi-metal or
Carbide Tipped Hole Saw
9.50
(241 cm)

SELECTING A MOUNTING LOCATION

1. Give consideration to the weight of the unit when
operating, i.e. when filled with water. Operating weight of
the LVRO-75HE RO System is:
• System without Storage Tank - 10.2 lbs (4.6 kgs)
• Storage Tank - 29.4 lbs (13.3 kgs)
2. The location should allow for:
• Minimum clearance of 2-1⁄2 inches (6.3 cm) under the
cartridge(s) so they can be lowered for removal
and replacement.
• Adequate space for "in" and "out" water line
connections.
• Be near a drain for flushing.
3.25
8.85
(225 cm)
3.10
4.92
(125 cm)
Figure 1
10.5"
(26.6cm)
16.00"
(40.6 cm)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Everpure lvro-75heEverpure lvro-75he+f

Table of Contents