Download Print this page

Trane BAYEVAC05LG1A Installer's Manual page 9

Supplementary electric heaters

Advertisement

STEP 8 - Connect high voltage wiring
1.
Connect the wiring to the lugs on the breaker models or
to the terminal block on the lug models as illustrated.
2.
Connect the ground wire to the ground lug.
3.
Connect the 3-pin plug on the heater to the 3-pin plug in
the air handler case.
Note: Minimum terminal screw torque is 45 in-lbs.
Factory
wiring
BLK
Field
Field
wiring
wiring
3-Phase Model
STEP 9 - Install the seal plate. Breaker models only.
1.
Place the seal plate over the breaker so the tab on the
right side is in place.
2.
Snap on the left side of the seal plate that has the slot
by the tab.
Factory
wiring
RED
Field
wiring
GREEN
Ground
INSTALLER'S GUIDE
Factory wiring
BLK
RED
Breaker Model
Factory
wiring
BLK
Field
wiring
LG (lug) Model
Snap in
place over
breaker
second
Field wiring
GREEN
Ground
RED
Factory
wiring
Field
wiring
GREEN
Ground
Place over
breaker first
Page 9

Advertisement

loading