Descaling The Steam Injection System; Descaling Process Sequence; Preparing The Descaling Process - Miele HR1956 Operating Instructions Manual

Dual fuel upright cooker 48" oven
Table of Contents

Advertisement

Descaling the steam injection
system 
When to run the descaling process
The frequency of descaling will depend
on the water hardness level in your
area.
The descaling process can be run at
any time.
However, to ensure that the oven
functions correctly, you will be
automatically prompted to run the
descaling process after a certain
number of programmes.
The oven will count down in the display
the last 10 programmes that can be run
before it needs to be descaled. Then it
will lock the Moisture Plus  function.
You will not be able to run this function
until descaling has been carried out.
All other functions can still be used.
Cleaning and care

Descaling process sequence

Once the descaling process has been
started, it must be completed through
to the end. It cannot be cancelled.
The descaling cycle takes approx.
90 minutes and consists of several
steps:

1. Preparing the descaling process

2. Drawing in the descaling solution
3. Activation phase
4. Rinse 1
5. Rinse 2
6. Rinse 3
7. Evaporating residual moisture
131

Advertisement

Table of Contents
loading

Table of Contents