Download Print this page

NCR 7761-K182 Kit Instructions

Usb + dual rj12 expansion

Advertisement

Quick Links

KIT  INSTRUCTIONS
USB + Dual RJ12 Expansion
Release 1.0
7761-K182
Issue A

Advertisement

loading

Summary of Contents for NCR 7761-K182

  • Page 1 KIT  INSTRUCTIONS USB + Dual RJ12 Expansion Release 1.0 7761-K182 Issue A...
  • Page 2 NCR, therefore, reserves the right to change specifications without prior notice. All features, functions, and operations described herein may not be marketed by NCR in all parts of the world. In some instances, photographs are of equipment prototypes. Therefore, before using this document, consult with your NCR representative or NCR office for information that is applicable and current.
  • Page 3: Revision Record

    Revision Record Issue Date Remarks Aug 2016 First Issue...
  • Page 4: Usb + Dual Rj12 Expansion

    USB + Dual RJ12 Expansion Introduction This kit provides the components to add a USB + Dual RJ12 Expansion.
  • Page 5: Installation Procedure

    7761-K182 (USB Dual RJ12 Expansion) Installation Procedure 1. Install the Expansion Funnel and Standoffs (4) into the rear of the Ebox. Caution: Always use a soft material (cloth, foam) to protect the display screen when placing the terminal face down.
  • Page 6 7761-K182 (USB Dual RJ12 Expansion) 3. Install the Expansion Board assembly into the funnel and secure to standoffs with screws (4). 4. Secure the Hinge Mount to the hinge of the stand and secure with screws (3).
  • Page 7 7761-K182 (USB Dual RJ12 Expansion) 5. Install the Hinge Mount over the Expansion Board assembly. 6. Secure to rear housing with screws (2).