Siemens SIMATIC PCS 7 Programming Manual page 51

Process control system simatic batch - views of the report data v9.0
Hide thumbs Also See for SIMATIC PCS 7:
Table of Contents

Advertisement

Name
cmd_filter
State
ExState
Flags
ContinousFlag
ExecuteInPLC
START
STOP
DurationPlanned
DurationActual
Deviation
MonitoringTime
StartEventID
LastEventID
GateLogic
Conditions
StartEventId
TAGS
ExStartTime
ExEndTime
SP_CS
AV_CS
AllocName4Rpe
UnitClassName4Rpe
AllocStrategy4Rpe
AllocMode4Rpe
AllocRunTime4Rpe
UnitName4Rpe
hasTags
hasComments
hasActions
hasErrors
hasParameters
hasRefreshParameters
hasMsg
*: The extended times are there to ensure that no messages, actions etc. are lost. The reason
for this is that such messages are sent, for example, a few milliseconds before the start or after
the end of the object. If the object has only been run once, this time period is set so that all the
information fits within it.
SIMATIC BATCH - Views of the report data V9.0
Programming Manual, 05/2017, A5E38208785-AA
Data type
Int
Int
Int
Int
Bit
Bit
datetimeoffset(3)
datetimeoffset(3)
Nvarchar(255)
Nvarchar(255)
Nvarchar(255)
Nvarchar(255)
Bigint
Bigint
Nvarchar(255)
Nvarchar(max)
Bigint
Nvarchar(max)
datetimeoffset(3)
datetimeoffset(3)
Nvarchar(255)
Nvarchar(255)
Nvarchar(255)
Nvarchar(255)
Nvarchar(255)
Nvarchar(255)
Nvarchar(255)
Nvarchar(255)
Bit
Bit
Bit
Bit
Bit
Bit
Bit
Description of the table value functions
Description
Status that the respective recipe phase must have in runtime
for a corresponding command to be passed
Status of the object
Expanded status of the object
Internal
Continue option set
Executed in AS-based mode
Status of the object
End time of the object
Planned duration (format: DD HH:MM:SS)
Actual duration (format: DD:HH:MM:SS)
Deviation between planned and measured duration (format:
DD:HH:MM:SS)
Monitoring time for the object (format: DD HH:MM:SS)
ID of the start notification of the object
ID of the last notification of the object
Linking logic of the transition conditions
Conditions in XML format
StartEventID of the object
Configured process tags in XML format
Extended start time of the object*
Extended end time of the object*
Setpoint of the control strategy
Process value of the control strategy
Unit allocation of the element
Unit class
Allocation strategy
1 ("Start Allocation"): Start batch processing only when the unit
is free
Duration of allocation (format: DD:HH:MM:SS)
Unit name
Process tags are configured for the element
Comments are available for the element
Actions are available for the element
Error are pending for the element
The element has parameters
Current parameters are available for the element
Messages might be available for the element
4.2 batch_GetStandardReport
51

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents