5 Power On and Power-Up
5.1

Start-up sequence

5.1
Start-up sequence
Start-up sequence
5-76
All mechanical and electrical installation work must be complete. Before the
system is started up, it is important to ensure that the control and its compo-
nents power up correctly. It is also essential that the equipment is installed in
accordance with the EMC guidelines given in the previous section.
The start-up procedure is detailed below. The order in which the individual steps
are taken is not mandatory, but recommended:
1. Check that SINUMERIK 840D powers up correctly (Chapter 5)
2. Enter basic settings (Section 6.6.1) and memory configuration (Section 6.7)
3. Scaling machine data (Section 6.8)
4. Set axis configuration (Section 6.9.1)
5. Configure and parameterize the drives (Section 6.9.2)
6. Set axis and spindle-specific machine data
– Axis velocities (Section 6.9.9)
– Axis monitoring (Section 6.9.11)
– Axis reference point approach (Section 6.9.12)
– Spindle data (Section 6.9.13)
– Spindle encoder matching (Section 6.9.15)
– Spindle velocities (Section 6.9.16)
– Spindle positioning (Section 6.9.17)
– Spindle monitoring (Section 6.9.19)
7. Transfer PLC user program and alarm texts (Chapters 7/8)
8. Axis/spindle test run (Chapter 9)
9. Drive optimization (Chapter 10)
– Frequency response measurements on speed and position control loops
(Section 10.5)
– Analog output (Section 10.8)
10. Data back-up (Chapter 11)
11. Software, hardware replacement (Chapter 12)
12. MMC (Chapter 13)