Download Print this page

Cisco Firepower 3500 Appendix page 7

Replacing a raid battery backup unit. assembly on the firepower management center.

Advertisement

Appendix A
Replacing a RAID Battery Backup Unit Assembly on the Firepower Management Center 3500
Remove the BBU assembly from the chassis.
Step 4
Installing the New BBU Assembly
Once the old BBU assembly is removed from the chassis, you can install the replacement BBU assembly
which comes pre-assembled for ease of installation. Cisco recommends that you install the replacement
BBU assembly as described in the following procedure.
To install the replacement BBU assembly:
Locate the tabs that secure the BBU assembly to the chassis. They are located on the inside floor of the
Step 1
chassis, on the left side, near the front of the chassis by the power supply (see
Align the clips on the bottom of the plastic battery tray (see "1" in
Step 2
chassis.
Slide the BBU assembly unit toward the power supply until the tabs engage with the notches in the
Step 3
chassis.
Make sure the side clip (see "2" in
Caution
place. Failure to properly secure the battery tray may allow the BBU assembly to move freely inside the
chassis. This could cause a malfunction, such as loosening of the BBU cable, which would jeopardize
the battery protection.
Carefully connect the cable to the new BBU. Make sure you observe cable polarity and uniformly insert
Step 4
the connector into the BBU connector.
Figure A-5
1
Underside of BBU Battery Tray
Tray clips
Cisco Firepower Management Center 750, 1500, 2000, 3500, and 4000 Hardware Installation Guide
Figure
A-5) has fully engaged with the chassis to lock the tray into
2
Side clip
BBU Replacement Instructions
Figure
A-6).
Figure
A-5) with the tabs on the
A-7

Advertisement

loading