Advertisement

OAL-100 INSTALATION INSTRUCTIONS
WARNING! AVOID ELECTRICAL SHOCK
DISCONNECT POWER DURING INSTALLATION
PLEASE READ ALL INSTRUCTIONS BEFORE INSTALLATION
POWER SUPPLY REQUIRED 115+/- 5VAC-60 HZ 0.4AMPS
CONTROL BOARD POWER SUPPLY 16VDC
CONTROL BOARD TO BE GROUNDED
KEEP FINGERS & CLOTHING CLEAR OF ALL MOVING PARTS
ADJUSTMENTS TO BE PERFORMED BY APPROVED TECHNICIAN ONLY
ALTERATION TO ANY COMPONENTS IS PROHIBITED
REMOVE ANY MECHANICAL DEVICES OR LOCKS THAT INTERFERE WITH
THE OPERATION OF THE DOOR, (OTHER THAN PARTS INTEGRATED WITH
THE OPERATOR SYSTEM).
OPERATOR TO BE INSTALLED 8 FEET MINIMUM ABOVE GROUND IF THERE
ARE ANY EXPOSED MOVING PARTS
O M E G A
A U T O M A T I C S
2 0 1 8
V 2 . 0

Advertisement

Table of Contents
loading

Summary of Contents for Omega OAL-100

  • Page 1 OAL-100 INSTALATION INSTRUCTIONS WARNING! AVOID ELECTRICAL SHOCK DISCONNECT POWER DURING INSTALLATION PLEASE READ ALL INSTRUCTIONS BEFORE INSTALLATION POWER SUPPLY REQUIRED 115+/- 5VAC-60 HZ 0.4AMPS CONTROL BOARD POWER SUPPLY 16VDC CONTROL BOARD TO BE GROUNDED KEEP FINGERS & CLOTHING CLEAR OF ALL MOVING PARTS...
  • Page 2 Mounting the Operator: Fasteners 120 VAC Notes: -Ensure that door swings and latches easily before attempting to add operator -Remove cover from operator -Operator to wall mounting must be very strong! -All loads from high winds & other overloads will be transferred thru the fasteners to the wall -Use appropriate fasteners and anchors for the type of wall being mounted to -Mounting to drywall construction requires plwood backer inside the wall to attach operator -If the door framing is proud of the wall, place a filler allowing the operator to sit flat &...
  • Page 3 Push Arm: - Requires cutting of the round bar - Mount block 14 1/2" from hinge - Install arm onto spindle as per diagram - Close door and place round shaft beside tube - Cut the round rod 2" past last grub screw - Rod can be slid in out for final adjustment - Slide rod into position and tighten grub screws - Remove complete arm from the shaft...
  • Page 4 Pull Arm: -Install roller onto arm (5/32" allen) -Install jumper wire to "hold open" motor -Slide arm onto shaft, typically 90 to 105 degrees & tighten pinch screw -Remove jumper wire so roller contacts door -Roller needs to be vertically centered in track -Fasten track to door (see diagram) -Place end caps on the track -Install safety washer &...
  • Page 5 Wiring: control board on/off switch to motor to magnet switches 120 VAC to be connected authorized electrician Notes: - Run 120 VAC power lines as per building code - Run low voltage wires to/from any input/outputs such as buttons or strikes - Power is to be connected by authorized electrician to local codes - Once power is hooked up the unit can be test cycled by pressing "ACT"...
  • Page 6 Setting the Magnets Left Push Back Check Right Push Back Check Left Push Latch Right Push Latch Left Pull Back Check Right Pull Back Check Left Pull Latch Right Pull Latch 2 0 1 8 O M E G A A U T O M A T I C S V 2 .
  • Page 7 Inputs/Outputs: Push Buttons Notes: - Connecting terminals COM to ACT1 will activate the operator to open - Push buttons, card readers etc will all wire the same - Multiple inputs can be wired together - Use 20 gauge wire Strike Notes: - use terminals LOCK &...
  • Page 8 Programming: Step 1: - door must be in closed position - screen will say "DOOR CLOSED" DOOR CLOSED - closed light will be illuminated Step 2: - Press MENU button to enter DOOR CLOSED programming Step 2b: - Press SEL (select) MAIN MENU (Settings) 2 0 1 8...
  • Page 9 Programming: Step 3: - Press UP & DN buttons to scroll SETTINGS (01) Overload 50 Step 4: - Press SEL to enter parameter SETTINGS Overload (50) Step 4b: - Press UP & DN to change value SETTINGS Overload (50) 2 0 1 8 O M E G A A U T O M A T I C S V 2 .
  • Page 10 Programming: Step 5: - Press SEL to exit parameter SETTINGS (01) Overload 50 Forced Relearn Step 1: DOOR CLOSED - From "DOOR CLOSED" screen - Press MENU - Press DN twice Step 1b: - Screen reads "MAIN MENU" (Calibrate) MAIN MENU - Press SEL twice for next screen (Calibrate) 2 0 1 8...
  • Page 11 Programming: Step 3: - Press MENU then ACT - Screen reads "CALIBRATE" CALIBRATE Relearn Next ACT Step 3b: - Screen reads "RELEASE STRIKE" (Learning) - Once one cycle is complete board RELEASE STRIKE has relearned itself (Learning) 2 0 1 8 O M E G A A U T O M A T I C S V 2 .
  • Page 12 Cover: - Snap cover onto backer plate - Attach cover fasteners Cover Cover Fastener Stickers: - Apply warning stickers to door - Refer to local codes for proper heights AAADM Sticker 2 0 1 8 O M E G A A U T O M A T I C S V 2 .

Table of Contents