FIG. 5
FIG. 6
Step 2: Two screws installed in the top frame.
FIG. 7
STEP 3: Two screws installed in the rear base.
FIG. 8
Drain water hose
TESTING LP GAS SAFETY
SHUTOFF
The gas safety shutoff must be tested after the re-
frigerator is connected to LP gas supply.
Hole for drain
water hose