Typical Chimney Installation - Napoleon HIGH COUNTRY 3000H Installation And Operation Manual

Eco solid fuel burning zero clearance appliance
Table of Contents

Advertisement

Available languages

Available languages

4.2

typical chimney installation

RAIN CAP
STORM COLLAR
ROOF FLASHING
ATTIC INSULATION
SHIELD
STRAIGHT CHIMNEY
* The first flue offset closest to the top of the appliance must be a
minimum distance of 12" (30.5cm) from the top of the appliance.
A.
Move the appliance into position. Try to center the exhaust
flue of the appliance, midpoint between two joists to prevent
having to cut them. Use a plumb bob to line up the centre.
B.
Cut and frame an opening in the ceiling to provide a
minimum clearance of 2" (50.8mm) between the outside of
the chimney and any combustible material. DO NOT FILL
THIS SPACE WITH ANY TYPE OF MATERIAL! Nail headers
between the joists for extra support. Firestop spacers must
be placed on each framed opening in any floor or ceiling
that the chimney passes through.
C.
Hold a plumb bob from the underside of the roof to
determine where the opening in the roof should be.
Cut and frame the roof opening maintaining proper
2" (50.8mm) clearances.
note:
30° or 45° offsets may be installed back to back.
STORM COLLAR
ROOF FLASHING
ATTIC INSULATION
SHIELD
15 FT
(4.6m)
MINIMUM
34 FT
(10.4m)
MAXIMUM
OFFSET
SUPPORT
SINGLE OFF-SET CHIMNEY
RAIN CAP
STORM COLLAR
ROOF FLASHING
ATTIC INSULATION
SHIELD
15 FT
(4.6m)
CEILING RADIATION
MINIMUM
34 FT
(10.4m)
MAXIMUM
FIRESTOP
12" (30.5cm)
MIN*
DOUBLE OFF-SET CHIMNEY
HEADERS
FIRESTOP SPACER -
UNDERSIDE OF JOIST
2" (50.8mm)
2" (50.8mm)
Min.
Typical Joist Framing
installation
RAIN CAP
15 FT
(4.6m)
MINIMUM
34 FT
(10.4m)
MAXIMUM
SHIELD
OFFSET
SUPPORT
FIRESTOP
12" (30.5cm)
MIN*
2" (50.8mm)
Min.
2" (50.8mm)
Min.
Min.
Typical Roof Joist Framing
W415-1761 / B / 12.21.18
EN
15