GE RAB77B Installation Instructions Manual
GE RAB77B Installation Instructions Manual

GE RAB77B Installation Instructions Manual

Room air conditioner case for az series zoneline models only
Table of Contents

Advertisement

Available languages

Available languages

Quick Links

Before you begin - Read these instructions completely and carefully.
IMPORTANT – OBSERVE ALL GOVERNING CODES AND ORDINANCES.
Note to Installer – Be sure to leave these instructions with the Consumer.
Note to Consumer – Keep these instructions with your Owner's Manual for future reference.
For further details, refer to the GE Architects & Engineers Design Data Manual for Zonelines. To obtain a copy
of that manual, call the GE Answer Center
NOTES:
• Handle the case carefully.
• The cardboard stiffener inside the case, and the rear
protective panel must remain in place until the chassis is
installed to assure case rigidity and squareness.
• If a sub-base is to be used, it may be desirable to
assemble it to the case before securing case to the
wall.
CRITICAL DIMENSIONS
Outside wall
"C"
NOTES:
• Care should be taken in location of electrical supply
entry in relationship to wall sleeve to ensure access
to power once the unit is installed.
• If the case is installed with any appreciable
projection (1" or greater) into the room, an insulation
kit (RAK901L) is available to minimize the formation
of condensation on the case.
Printed in the United States
®
at 800.626.2000 or visit us at www.Zoneline.com.
Ceiling
"A"
"B"
Roomside
"D"
Finished floor or top of carpet
Installation Instructions
for your new
RAB77B
Room Air Conditioner Case
for AZ Series Zoneline Models
Only
CASE LOCATION
As a general rule the air conditioner should
be located in an outside wall to ensure proper
distribution of conditioned air. It should be located
in a portion of the wall where there is no electrical
wiring or plumbing, and where there are no
obstructions immediately inside or outside.
RECOMMENDED
DIMENSIONS
INSTALLATION CLEARANCE
A
B
Projection of case into room—
2
3 8
into the room, a sub-base or other
support is recommended.
C
D
Height above finished floor or
top of carpet—
E
Left/Right side of case to adjacent
INSTALL CASE LEVEL IN ALL DIRECTIONS
"E"
1
Top of case
Outside wall
31-30780-1
"E"
08-16 GEA

Advertisement

Table of Contents
loading

Summary of Contents for GE RAB77B

  • Page 1 Note to Consumer – Keep these instructions with your Owner’s Manual for future reference. For further details, refer to the GE Architects & Engineers Design Data Manual for Zonelines. To obtain a copy of that manual, call the GE Answer Center ®...
  • Page 2: Preparation Of The Wall

    STEP 1 STEP 2 Preparation of the wall Installation of the case in the wall opening The wall case should be installed during Use lintel, when required, to support brick and construction and lintels should be used to support block above the case. the block above the wall case.
  • Page 3 STEP 2 (cont.) STEP 3 Installation of the case in the wall opening Weatherproofing Weatherproof gaps between the exterior and interior walls and the case with caulking or equivalent weatherproofing material. Wood screw Steel lintel Molly or toggle bolt Caulk* Caulk* Expansion anchor bolt...
  • Page 4: Electrical Requirements

    It may be desirable or necessary to install the drain kit on the case prior to installing the case into the wall. SCREW SCREW Type “A” Type “B” METAL PLASTIC Specifications subject to change without notice A Quality Product of GE Appliances...
  • Page 5 Pour obtenir de plus amples détails, consultez le manuel GE des données de conception à l’intention des architectes et ingénieurs pour les appareils Zoneline. Pour obtenir une copie de ce manuel, contactez le GE Answer Center® au 800.626.2000 ou visitez- nous au www.Zoneline.com.
  • Page 6: Préparation Du Mur

    ÉTAPE 1 ÉTAPE 2 Préparation du mur Installation du boîtier dans une ouverture murale Le boîtier mural doit être installé pendant la construction et des linteaux doivent être utilisés pour supporter le bloc Utilisez un linteau, au besoin, pour soutenir la au-dessus du boîtier mural.
  • Page 7 ÉTAPE 2 (suite) ÉTAPE 2 3 Installation du boîtier dans l’ouverture Étanchéisation murale Étanchéisez les espaces entre les murs extérieur et intérieur, et le boîtier avec du calfeutrement ou un matériau Vis à bois d’étanchéisation équivalent. Boulon à gaine Steel lintel d’expansion ou à...
  • Page 8: Exigences Électriques

    être souhaitable ou nécessaire d’installer un ens. de drain sur le boîtier avant d’installer le boîtier dans le mur. Type « A » Type « B » MÉTAL PLASTIQUE Spécifications modifiables sans préavis Un produit de qualité GE Appliances...

Table of Contents