Tools And Materials; Before You Begin - Kohler K-1800 Installation And Care Manual

Freestanding bath
Table of Contents

Advertisement

Available languages

Available languages

Tools and Materials

Safety Glasses
Silicone Sealant

Before You Begin

CAUTION: Risk of personal injury. This bath is extremely heavy. Obtain sufficient help and use
lifting straps to carefully lift or move the bath.
IMPORTANT! To ensure a successful installation it is important that you install the bath on a level
finished floor.
Observe all local plumbing and building codes.
IMPORTANT! The drain cover and gaskets are included in a small box within the carton. Make sure you
locate and retain the small box before discarding the carton and packing material.
Unpack and inspect the bath for damage. Return the bath to the carton until installation.
To simplify future maintenance, make sure all plumbing connections around the bath are easily
accessible.
Carefully plan moving the bath into the installation area. This bath is heavy and will not easily fit
through doorways.
Install the bath to an adequately supported, level finished floor.
This bath is designed for a freestanding installation only.
This bath features a factory-installed drain and an integral, cast overflow.
Install a floor- or ceiling-mounted bath filler with this freestanding bath.
Illustrations shown may not look like your actual product but they are still correct for this
installation.
This bath conforms to ANSI Standard Z124.1.2. All dimensions are nominal.
1207308-2-A
Tape Measure
Level
Plus:
• Drop Cloth
• Lifting Straps
• Shims
Pencil
• 2x4's
• Common Woodworking Tools
• Short 1-1/2" D. PVC Pipe or Coupling
Rubber Mallet
2
Kohler Co.

Advertisement

Table of Contents
loading

This manual is also suitable for:

K-1801K-1805

Table of Contents