Table Of Contents - Smith Cast Iron Boilers 19A SERIES Installation Instructions Manual

Smith 19a series boiler installation instructions
Table of Contents

Advertisement

SECTION
DESCRIPTION
19A SERIES ISOMETRIC DRAWING
PARTS LIST

TABLE OF CONTENTS

1
GENERAL INFORMATION
2
BOILER LOCATION
3
CODES AND REGULATIONS
4
CHIMNEY AND BREECHING
5
6
7
8
9
1.
GENERAL
19A Series boilers are wet-base, extended surface, vertical
flue design with integral cast flue gas collector for pressurized
firing with oil, gas or combination power burners. Upper and
lower port hydronic seals are of a special material resistant to
petroleum products and compatible with ethylene and
propylene based anti-freeze (non automotive type) which does
not contain corrosion inhibitors to protect aluminum. The flue
gas joints between sections, etc. are sealed using high
temperature (2300 F) ceramic fiber rope. Access to the heating
surface for cleaning is provided from the left hand side of the
boiler through large cast iron cover plates. A slide damper is
provided in the flue gas outlet for back pressure adjustment.
The boilers are supplied completely knocked down for field
assembly, as factory assembled blocks of sections or
completely assembled boiler-burner units. All items should be
inspected for damage upon receipt, and any damage reported
to the wholesaler and trucker. All components should be
stored in a clean, dry area.
The boilers are conservatively rated for high efficiency
performance with capability for down-firing to match connected
load. The large OBROUND upper port provides transfer area
above the water surface for dry steaming at full load.
2.
BOILER LOCATION
The boiler must be installed on a smooth, level, non-
combustible floor or pad as close to the chimney or vent
location as possible to minimize breeching length. Allow
clearance around the boiler for piping, service, maintenance,
cleaning and tankless coil removal. Approximately 30 inches
on the sides is a minimum (Check local code requirements).
Do not install electrical conductors in floor or pad under boilers.
See FIGURE 1 for boiler floor pad requirements, and TABLE
1 for minimum required pad length.
TABLE 1
Boiler No.
Min. Recommended Pad Length
19-*-3
19-*-4
19-*-5
19-*-6
19-*-7
19-*-8
19-*-9
19-*-10
19-*-11
19-*-12
19A SERIES BOILER
TABLE OF CONTENTS
PAGE
2
2
3
3
3
3
3
4
4
5
5
6
30"
36"
42"
48"
54"
60"
66"
72"
78"
84"
SECTION
DESCRIPTION
10
11
12
BURNER MOUNTING PLATE
13
CLEANOUT COVERS
14
REAR OBSERVATION PORT
15
16
17
SAFETY AND RELIEF VALVES
18
CLEANING BOILER WATERWAYS
19
OWNER'S INSTRUCTIONS
CONTROL TAPPINGS DIAGRAM
WARNING
3.
CODES AND REGULATIONS
All work in connection with the boiler, burner and controls
must be performed in strict accordance with requirements of
state and local authorities having jurisdiction over boiler
installations.
JACKET SIDE PANEL
FLOOR
OR PAD
1 1/2" x 2 1/2" ANGLES
4 5/32"
12 27/32"
25 21/32"
FIGURE 1
In the absence of such local requirements, the following should
govern:
A.S.M.E. Section IV - "Heating Boilers"
A.S.M.E. Section VI - "Care and Operation of Boilers"
ANSI/NFPA 31 - "Installation of Oil Burning Equipment"
ANSI/Z223.1 - "National Fuel Gas Code"
ANSI/NFPA 70 - "National Electrical Code"
4.
CHIMNEY AND BREECHING
The breeching connection between boiler and chimney should
be as direct as possible with the minimum number of elbows or
bends. It should pitch upwards to the chimney at a rate of 1/4
inch per foot of horizontal run. Generally, the breeching and
chimney should be the same diameter as the boiler outlet
connection.
NOTE
11 and 12 section uses adapter collar for connection to
12" diameter vent system.
For fuel conservation and stable burner performance, the
vent connection from the boiler should not include a barometric
draft control or other opening unless the venting system can
develop an excessive draft, or is required by code.
PAGE
10
11
32"
C L
OF BOILER
12 27/32"
4 5/32"
34"
PAGE 3
6
6
7
8
8
8
8
8
9
9

Advertisement

Table of Contents
loading