Installation Tools - 3Com Switch 7700 Installation Manual

Hide thumbs Also See for Switch 7700:
Table of Contents

Advertisement

Figure 14 Switch 7700 placement

4.3. Installation Tools

Table 24 provides a list of the tools you need to install the Switch 7700.
Table 24 Required installation tools
General tools
Special tools
Instruments
P R E P A R I N G
Measure and
Long tape, ruler (of 1 meter), gradienter, marking pen, powder marker
lineation tools
and pencil
Drills
A percussion drill, several auxiliary drill bits, a vacuum cleaner
Flat-blade screwdriver P4-75mm
Phillips screwdriver P1-100mm, P2-150mm and P3-250mm
Fastening tools
Socket wrench M5
Box-end wrench M6
Box-end wrenches (10-12) or open-end wrench (10-12)
Sharp-nose pliers, diagonal pliers, vices, hand-held electric drill, file,
Small tools
handsaw, crowbar and rubber hammer
Anti-static wrist strap, cable stripper, crimping pliers, RJ-45 crimping pliers and wire punchdown
tool
Multimeter, 500V Meg-ohmmeter (used to measure the insulation resistance), error detector,
optical power meter and earth resistance tester
F O R
I N S T A L L A T I O N
27

Advertisement

Table of Contents
loading

Table of Contents