Daikin AT09HV2S Service Manual page 16

Removal procedure, 2.5/3.5/5.0 kw class, 9000/13000 btu/h class, indoor unit, inverter/non-inverter, wall mounted type, cooling only, heat pump
Table of Contents

Advertisement

Removal of PCBs
Step
3. Remove the terminal
board.
1
Remove the screw and
remove the terminal
board.
4. Remove the signal
receiver unit.
1
Unfasten the 3 hooks
and remove the signal
receiver unit.
Unfasten the 2 hooks.
2
14
Procedure
Terminal board
Signal receiver unit
Hook
Hook
(R4354)
Hook
(R4355)
(R12725)
Hook
(R16033)
Si04-751
Points
Removal Procedure

Advertisement

Table of Contents
loading

Table of Contents