Step 11 Performing the drainage test

1 Do a leak test at the connection part of the flexible hose
and the drain pipe:
a Connect a general hose to the connection part of
the flexible hose of the indoor unit, and pour in
some water.
Hose
b After pouring some water, reassemble the rubber
cap on the connection part of a flexible hose of
the indoor unit and firmly tighten it with a band
to prevent leakage.
c Check the leak test at the part where the adhesive
for the flexible hose and the drain pipe is used.
CAUTION
• The leak test must be performed for at least 24 hours.
2 Check the condensed water drainage:
a Pour about 2 liters of water into the indoor unit
drain pan as shown in the picture.
b When the electric cable connection is completed
• Turn on the indoor unit and outdoor unit.
• Operate in the Cool mode.
360_AC_Indoor_IM_AU_ENG_EN.indb 15
Water leakage
check part
Flexible hose
CAUTION
• Only in the Cool mode, you can check the correct
operation of the drain pump.
When the electric cable connection has not been
completed
• Remove the control box cover of the indoor unit.
• Connect the power supply (220V, 50 Hz) to the L and
N terminals.
• Reassemble the control box cover and turn on the
indoor unit.
CAUTION
• When the float switch is not detected due to
insufficient water on the drain pan, the drain pump
will not work.
• If the power supply is directly connected to the
L and N terminals, communication error message
might appear.
• After completing the drainage check, turn the unit
off and disconnect the power supply.
• Reassemble the control box cover.
c Check whether the drain pump works correctly.
d Check whether the drainage is performing
correctly at the end of the drain pipe.
e Check for leakage at the drain pipe and drain pipe
connection part.
f When leakage occurs, check whether the indoor
unit is level and check the drain hose connection
part, drainpipe connection part and drain pump
connection.
g When the drainage check is completed and the
condensed water remains on the drain pan,
remove the water.
Step 12 Connecting the power and
communication cables
CAUTION
• Always remember to connect the refrigerant pipes
before performing the electric connections.
When disconnecting the system, always disconnect the
electric cables before disconnecting the refrigerant
pipes.