Checking The Drainage And Forming The Pipings - LG L3UC482FA0 Installation Manual

Multi type air conditioner
Hide thumbs Also See for L3UC482FA0:
Table of Contents

Advertisement

Available languages

Available languages

Checking the Drainage and Forming the Pipings

Checking the drainage
To check the drainage.
1. Pour a glass of water on the evaporator.
2. Ensure the water flows through the drain
hose of the indoor unit without any leakage
and goes out the drain exit.
Drain piping
1. The drain hose should point downward for
easy drain flow.
2. Do not make drain piping.
Do not raise
Water
leakage
Accumulated
drain water
Air
Water
Waving
leakage
Checking the Drainage and Forming the Pipings
Tip of drain hose
dipped in water
Water
leakage
Ditch
Downward slope
Less than
50mm gap
Installation Manual 17

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

L4uc602fa0L4uh602fa0

Table of Contents