Download Print this page
HP J1530C Installation Instructions Manual
HP J1530C Installation Instructions Manual

HP J1530C Installation Instructions Manual

Rack kit for rp74xx/rx76xx/seu servers

Advertisement

Quick Links

HP J1530C Rack Kit for
rp74xx/rx76xx/SEU
Servers

Installation Instructions

© Copyright 2005, 2007 Hewlett-Packard Development Company, L.P.
The information contained herein is subject to change without notice. The
only warranties for HP products and services are set forth in the express
warranty statements accompanying such products and services. Nothing
herein should be construed as constituting an additional warranty. HP shall
not be liable for technical or editorial errors or omissions contained herein.
Part Number 391342-004
April 2007 (Fourth Edition)

Kit contents

WARNING: Do not mount this rack integration
kit in a rack with sectional columns, such as the
HP 5642 rack.
If any of the following items are missing or damaged, contact
your HP authorized reseller. The following hardware pieces
are included in this kit.
Quantity Description
1
Cable management arm
(5069-6366)
1
Slide, left
(A6434-04045)
1
Slide, right
(A6434-04046)
3
Cable tie
(1400-3011)
2
Mounting bracket and spring
(5069-6363)
2
Actuator bracket
(5003-0540)
1
Long rod, 17U
(5003-0538)
1
Short rod, 17U
(5003-0541)
1
Long rod, 10U
(5003-0539)
1
Short rod, 10U
(5003-0542)
1
Installation instructions
Picture

Advertisement

loading

Summary of Contents for HP J1530C

  • Page 1: Kit Contents

    © Copyright 2005, 2007 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. The only warranties for HP products and services are set forth in the express warranty statements accompanying such products and services. Nothing herein should be construed as constituting an additional warranty.
  • Page 2: Hardware Contents

    Hardware contents Anti-tip stabilizers The anti-tip stabilizers provide stability and support when Identification Quantity Description Picture equipment is installed, removed, or accessed within the rack. M4 hex lock nut Stabilizer kits are available in both 600-mm (23.62-in) and (0535-0076) 800-mm (31.50-in) versions. Use the side feet provided with these kits to stabilize stand-alone racks.
  • Page 3 Item Reference Part number Attach barrel nuts to the rear columns. Storage bracket A6752-00114 Installing servers into round- hole racks Attach barrel nuts to the front columns. Item Reference Product outline Positions for mounting the cable management arm (refer to step 7) Positions for mounting the rear of the slides (refer to step NOTE: Single racks with a mounted component Item...
  • Page 4 WARNING: Use the following procedure only if a lift is not available. This procedure should only be attempted by two authorized HP service personnel, as a fully loaded server can weigh up to 99.79 kg (220 lb). Before attempting this procedure, HP recommends that you first remove all cell boards and AC power supplies.
  • Page 6 Secure the slides to the server. Install the bezel front. Install the cable management arm. Install the interlock device. Attach screws (B) to the left rear column. NOTE: If the rack is bolted to the floor or is used in a rack configuration with at least four bayed racks, Slip the cable management arm over the screws (B) then the interlock device is not necessary.
  • Page 7 Installing servers into square- hole racks Attach cage nuts (H) to the front columns. Item Reference Second product First mounting holes for second product First product Install the rods as shown in the following figure. Item Reference Product outline Positions for mounting the product (refer to step 9) Positions for mounting the front of the slides (refer to step...
  • Page 8 Item Measurements required for rack Attach cage nuts (H) to the rear columns. 476.2 mm (18.75 in) 711 to 774.7 mm (28 to 30.5 in) Install the right and left slides into the rack. NOTE: Single racks with a mounted component exceeding 99.79 kg (220.99 lb) do not require a stabilizer kit to be installed.
  • Page 9 WARNING: Use the following procedure only if a lift is not available. This procedure should only be attempted by two authorized HP service personnel, as a fully loaded server can weigh up to 99.79 kg (220 lb). Before attempting this procedure, HP recommends that you first remove all cell boards and AC power supplies.
  • Page 10 Secure the slides to the server. Install the cable management arm. Attach screws (B) to the left rear column. Slip the cable management arm over the screws (B) and tighten. Extend the cable management arm to the left rear side of the product. Attach the cable management arm to the studs, and secure it with nuts (E).
  • Page 11 Install the bezel front. Item Reference First mounting-holes for second product First product Install the rods as shown in the following figure. Install the interlock device. NOTE: If the rack is bolted to the floor or is used in a rack configuration with at least four bayed racks, then the interlock device is not necessary.
  • Page 12 Installing SEU into round-hole Attach barrel nuts (D) to the front columns. racks NOTE: The SEU can only be used with the rp84XX and rx86XX server. Item Reference Server Item Reference SEU outline Positions for mounting the product (refer to step 6) Positions for mounting the front of the slides (refer to step Server...
  • Page 13 Attach barrel nuts (D) to the rear columns. Install the right and left slides into the rack. Do not tighten the outer screws. Item Reference SEU outline Remove and discard the center screw, allowing the slide Positions for mounting the cable management arm (refer to step 7) to lower slightly, and then tighten the outer screws.
  • Page 14 Slip the cable management arm over the screws (B), CAUTION: This server must be unpacked in an ESD and tighten. safe environment. Observe all ESD safety precautions before attempting this procedure. Failure to follow ESD safety precautions can result in damage to the server.
  • Page 15 Install the bezel front. Item Reference First mounting holes for SEU Server Install the rods. Install the interlock device. NOTE: The interlock device is required for each rp84XX and rx86XX and SEU pair installed. NOTE: The products must be racked adjacent to each other to use the interlock device.
  • Page 16 Installing SEU into square-hole Check the clearance between the short rod and the bottom actuator bracket. If the clearance is less than 1 racks mm (0.04 in), then proceed to step 12. If the clearance is greater than 1 mm (0.04 in), then proceed to step 13. Attach cage nuts (H) to the front columns.
  • Page 17 Item Measurements required for rack Attach cage nuts (H) to the rear columns. 476.2 mm (18.75 in) 711 to 774.7 mm (28 to 30.5 in) Install the right and left slides into the rack. Do not tighten the outer screws. NOTE: Single racks with a mounted component exceeding 99.79 kg (220.99 lb) do not require a stabilizer kit to be installed.
  • Page 18 Remove and discard the center screw, allowing the slide Insert screws to secure the server to the slides. to lower slightly, and then tighten the outer screws. Install the cable management arm. Place the server on the slides using a lift kit. Attach screws (B) to the left rear column.
  • Page 19 Install the bezel front. Install the rods. Check the clearance between the short rod and the bottom actuator bracket. If the clearance is less than 1 Install the long and short rod. mm (0.04 in), then proceed to step 13. If the clearance is greater than 1 mm (0.04 in), then proceed to step 14.
  • Page 20 Push the actuator bracket down while tightening the screw. Verify the clearance again. If necessary, readjust, and then go to step 13.