Display Bracket Installation - Weil-McLain Series 2 Manual

Wall mount gas-fired water boilers
Hide thumbs Also See for Series 2:
Table of Contents

Advertisement

®
S
ERIES

Display bracket installation

Determine display unit location
1. Boiler display unit can be mounted on either the right side of the
boiler jacket or on the wall in close proximity to the boiler
2. For displays mounted on the boiler jacket, use the provided display
bracket.
a. For boilers mounted using the optional floor stand kit, always
mount the display to the display bracket on the boiler jacket.
See page 115 for information on the optional floor stand kit.
3. For displays mounted on the wall, the back plastic housing of the
display can mount either directly to the wall or a standard 2" x 4"
junction box.
a. The display should be mounted within 2 feet of the top right
corner of the boiler. If mounted further away, the display's wire
harness will not reach.
DO NOT cut or splice the display wire harness. If display
is mounted too far from the boiler for the provided wire
harness, relocate the display closer to the boiler.
Display bracket installation
nstall display bracket to the boiler jacket BEFORE installing
I
any piping.
1. Remove the two (2) screws on the top right side of the boiler above
the supply pipe shown in Figure 6.
2. The front screw is a pivot to rotate the display bracket up or down
depending on the boiler mounting height and desired display
angle. Potentional mounting angles are demonstrated in Figure 7.
3. Ensure that intended piping locations will not interfere with the
display housing when mounted.
Installing the display bracket after piping may result
in interference between the piping and display. Leave
clearance around the bracket because the display is
larger than the bracket.
It may be helpful to remove the display from the box
and temporarily fit it up to the bracket to estimate the
needed clearance. Remove display before piping boiler.
Damage to display may occur, if not removed.
Display installation on wall
1. Ensure mounting location follows guidelines in paragraph 3 of
"Determine display unit location" above.
2. Separate the front and back pieces of plastic.
3. If mounting directly to drywall or plaster, use one of these
methods:
a. Route wire through the back of the unit like a thermostat by
routing wire harness through the wall.
b. Use spacers behind the plastic to allow space for routing the
wire harness behind the plastic backing and entering through
the back.
4. Drill two 3/16-in. mounting holes in wall where marked.
5. Secure back plastic to wall with two (2) anchors and screws
making sure allowance has been made for the display wire
harness to enter through the back.
6. Keep front half of display safe until it is time to wire the display.
Wire the display after piping is complete.
12
2
-
G
AS
FIRED WATER BOILER
(on boiler jacket)
— Boiler Manual
Display installation on junction box
1. Ensure mounting location follows guidelines in
paragraph 3 of "Determine display unit location".
2. Remove one knockout to allow the wire harness to
pass through to the back of the plastic once inside the
junction box.
3. Mount the display after piping is completed and the
display wire harness has been routed to box. Use a
bushing or clamp to ensure harness is secure to the
junction box and insulation will not be damaged.
Figure 6
View right side of boiler - screws for
mounting display bracket
Figure 7
Display on bracket - potential mounting
angles
Part number 550-142-190/1218

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eco 110Eco 155Eco 70

Table of Contents