Epo Port (Emergency Power Off); Load Segments (1000Va To 3000Va) - Toshiba T1000 Series Installation And Operation Manual

Single-phase 1000-3000va
Hide thumbs Also See for T1000 Series:
Table of Contents

Advertisement

13.1

EPO PORT (EMERGENCY POWER OFF)

A customer-supplied switch located remotely can be used to open the EPO connection
and allows UPS output receptacles to be switched off. Since the EPO shuts down the
equipment immediately, orderly shutdown procedures are not followed and not by any
power management software. The UPS will have to be manually restarted in order to
regain power to the outlets.
Network Transient protector (1000VA to 3000VA)
The network transient protector, located on the back panel, has both IN and OUT jacks,
and houses a single RJ-45 (10BaseT) network connector. Connect the input connector to
the jack labeled IN, and the output connector to the jack labeled OUT.
13.2

LOAD SEGMENTS (1000VA TO 3000VA)

The power management software controls the sets of receptacles known as load segment
which provides organized shutdown and startup of the equipment. Less critical equipment
can be turned off during power outages saving battery power for critical loads. The power
management software manual has more details regarding this. The load group status can
be viewed from the LCD display and can be changed if necessary. These load segments
are usually handled with the UPS management software.
T1000 Series UPS 1000-3000VA Installation and Operation Manual – 94086-001
29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents