Sanyo ECO R410A Installation Instructions Manual page 26

Eco-i system air conditioner
Table of Contents

Advertisement

5. Flare Insulation of Tubing
After completing a leakage test, apply heat insulation. (Fig. 3-55)
* Use the flare insulator provided with the product.
6. Securing the External Electronic Expansion Valve After Connection with Tubing
After connection with tubing, secure the external electronic expansion valve using the supplied clamps (large) to
hold it against the gas tube. (Fig. 3-56)
* Be careful not to tighten the clamps with excessive force in order to avoid deforming the tubing or other parts.
Indoor side
Insulating tape
Flare insulator
Clamps (small)
Be careful not to allow a gap to
occur between the thermal
insulation of the tubing and the
thermal insulation of the main unit.
Liquid tube
Outdoor side
Insulating tape
Flare insulator
Clamps (small)
Fig. 3-55
Clamp (large)
Gas tube
Clamp (large)
Fig. 3-56
26

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents