GE Sievers 900 Series Operation And Maintenance Manual page 181

On-line total organic carbon analyzers
Table of Contents

Advertisement

12. Remove the new pump tubing from the shipping container.
13. Connect the single end of the new tubing (below the Y-fitting) to the waste outlet on the
Analyzer bulkhead (connect as much of the tubing as possible, or approximately 1/4" to 1/
2" onto the waste fitting).
14. Position the tubing in the left slot of the support bracket.
15. Run the tubing counter-clockwise through the sample pump. Loosen the second screw on
the occlusion plate if necessary. The tubing should sit side-by-side; be careful not to twist
the tubing, and make sure it sits on the center of the rollers so it is even all around the
pump.
16. Pull the tubing through the sample pump so there is no slack in the tubing.
17. Position the tube stop just above the right slot of the support bracket.
GE Analytical Instruments ©2009
Figure 34: Replacing the Sample Pump Tubing
181 of 236
DLM 90488-01 Rev. A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents