Daikin SKYAIR Service Manual page 37

Inverter single split
Hide thumbs Also See for SKYAIR:
Table of Contents

Advertisement

Appendix A
4. Power supply waveforms check procedures
Measure the power supply waveform between Live and Neutral on the terminal board, and check the
waveform disturbance. (using oscilloscope)
• Check if the power supply waveform is a sine wave (Fig. 1).
• Check if there is waveform disturbance near the zero cross (sections circled in Fig. 2).
Fig. 1
34
Fig. 2
(R1726)
(R1444)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents