Unpacking And Inspecting A New Switch - Cisco Nexus 7706 Hardware Installation Manual

Nexus 7000 series
Hide thumbs Also See for Nexus 7706:
Table of Contents

Advertisement

Unpacking and Inspecting a New Switch

Statement 1018
If you are using the combined power mode or power-supply redundancy, you need only one power source. If
Note
you are using input-source redundancy or full redundancy, you need two power sources.

Unpacking and Inspecting a New Switch

Before you install a new chassis, you need to unpack and inspect it to be sure that you have all the items that
you ordered and verify that the switch was not damaged during shipment. If anything is damaged or missing,
contact your customer representative immediately.
Caution
When you handle the chassis or its components, you must follow ESD protocol at all times to prevent ESD
damage. This protocol includes but is not limited to wearing an ESD wrist strap that you connect to the earth
ground.
Tip
Do not discard the shipping container when you unpack the switch. Flatten the shipping cartons and store
them with the pallet used for the system. If you need to move or ship the system in the future, you will need
these containers.
Step 1
Compare the shipment to the equipment list that is provided by your customer service representative and verify that you
have received all of the ordered items.
The shipment should include boxes for the following:
• System chassis, which includes the following installed components:
• 1 or 2 supervisor modules
• 1 to 4 I/O modules
• Up to 6 fabric modules
• 3 fan trays
• 1 to 4 power supply units
• Switch accessory kit
To see a list of what is included in this kit, see
• Cable management frames
• Left and right side frames
• Top frame
• M4 x 12 mm flat-head Phillips screws (12)
Cisco Nexus 7706 Hardware Installation Guide
16
Cisco Nexus 7706 Switch Accessory Kit, on page
Installing the Switch Chassis
167.
OL-31330-01